725
How we built a playground in the country
It will be 22 pictures and words
1. eye on the place:
2 as "advanced" people "prosherstili» Internet and picked the right option structure:
3, is true, then it had to be refined:
Dimensions:
In length: 1.35 (house) + 1.10 (Balcony)
Width total: 1.35 (adjust to materials)
Height: 1st floor - 1.10, 2nd floor - 1.50. The angle for the swing can make any.
4, and the work has begun to boil ...
They dug pits prosmolili bar ...
5, ... assembled frame and install it.
6 During the preparation of cement mortar in a bag with sand showed another bag - only this time with wet sand. And it seems to take us!
The frame is ready - it was the turn of flooring.
We went to the market - at the board for facing house. My husband wanted first to use the "Power House" (imitation logs), but it was too expensive for the children's house turns out - 400 rubles. per cubic meter, which is about about 4 thousand. for the lining. As a result, we decided to use plain bunk.
7, began facing the rest of the walls, forming the windows.
8 Test Drive window:
9, and the formation of the window onto the balcony:
10, Saturday. Today, supposedly a day of rest - are celebrating the birthday of my grandmother (76 years).
Gains future inhabitants of the house and began to actively settle. Here guests found a job - installed roof rafters.
11, came the turn of the roof. There were several variants of the roof: color polikarbonad, ondulin, shingles. All this is nice, but: a) was afraid that in the house (as the sunny side) will be hot and humid; b) expensive, and the price will go much overlap; c) a lot of scrap and residues.
We decided to close the paneling for painting, and there you are:
12 It's time to take a balcony. Balcony wanted to do with balusters (elements banisters). Ready and beautiful version costs from 200 rubles per share. Because we chose to use a low-budget option - shovel handles (unit price somewhere 40 rubles).
The boards for the cuttings (drill bit) to cut a hole. The same hole cut out in a bar, play the role of a handrail, railing and then polished with a drill with another special nozzle.
13 Here's what happened:
14, voids between the balusters and the holes filled with adhesive (so that the water does not leak):
15, graduated from the balcony and roof do. Boca remains closed (from Greenhouses) polycarbonate and paneling.
16 And we have grown exotic wood:
17, about the "artificial" bananas thought, but here's where to buy them until you looked closer. Leaves, by the way, to buy (not fall) in stock ritual supplies. More for fun like a monkey on top of the palm plant.
We make a "wall bars". My husband knocked together just such a structure:
18 framed under it (in the dug pit) 2 timber 50x100 - died.
19 Then, in the tool bar to make holes for the cuttings from the shovel, which now acts as a ladder. The bottom of the timber coated with bitumen (so as not rotten).
20, the design build and install to its rightful place:
21, issue price
Not all built, but let's count of about:
Bruce 100x100 length 6 m (can be smaller) - using 6 pieces, but will need more - the price of 250 rubles. apiece.
Bar 50x50 was in there, I do not remember how much was used - about 4 pcs.
Boards on the floor are available (departure from previous construction)
Molded on the paneling - 2000 rubles. - 46 pieces out. However, a few pieces left.
Lining the roof - 15 pcs. 900 rubles. - 250 rubles. cbm
Cuttings 15 pcs. - 40p. (but we have sold to 30)
Various corners, screws, tools to drill (250 +75), etc.
Total: 5800 rubles.
You may also need to process the tar-Ground all timber + cement + sand.
But again, not all purchased: Need corners and wooden frames.
22 As you can see, everything is quite accessible to the average U-mamtsu!
And finally - a small bonus: a few ideas for the site in the country:
Posted in [mergetime] 1367553801 [/ mergetime]
Thank you I have everything! All the holidays!
Source:
1. eye on the place:
2 as "advanced" people "prosherstili» Internet and picked the right option structure:
3, is true, then it had to be refined:
Dimensions:
In length: 1.35 (house) + 1.10 (Balcony)
Width total: 1.35 (adjust to materials)
Height: 1st floor - 1.10, 2nd floor - 1.50. The angle for the swing can make any.
4, and the work has begun to boil ...
They dug pits prosmolili bar ...
5, ... assembled frame and install it.
6 During the preparation of cement mortar in a bag with sand showed another bag - only this time with wet sand. And it seems to take us!
The frame is ready - it was the turn of flooring.
We went to the market - at the board for facing house. My husband wanted first to use the "Power House" (imitation logs), but it was too expensive for the children's house turns out - 400 rubles. per cubic meter, which is about about 4 thousand. for the lining. As a result, we decided to use plain bunk.
7, began facing the rest of the walls, forming the windows.
8 Test Drive window:
9, and the formation of the window onto the balcony:
10, Saturday. Today, supposedly a day of rest - are celebrating the birthday of my grandmother (76 years).
Gains future inhabitants of the house and began to actively settle. Here guests found a job - installed roof rafters.
11, came the turn of the roof. There were several variants of the roof: color polikarbonad, ondulin, shingles. All this is nice, but: a) was afraid that in the house (as the sunny side) will be hot and humid; b) expensive, and the price will go much overlap; c) a lot of scrap and residues.
We decided to close the paneling for painting, and there you are:
12 It's time to take a balcony. Balcony wanted to do with balusters (elements banisters). Ready and beautiful version costs from 200 rubles per share. Because we chose to use a low-budget option - shovel handles (unit price somewhere 40 rubles).
The boards for the cuttings (drill bit) to cut a hole. The same hole cut out in a bar, play the role of a handrail, railing and then polished with a drill with another special nozzle.
13 Here's what happened:
14, voids between the balusters and the holes filled with adhesive (so that the water does not leak):
15, graduated from the balcony and roof do. Boca remains closed (from Greenhouses) polycarbonate and paneling.
16 And we have grown exotic wood:
17, about the "artificial" bananas thought, but here's where to buy them until you looked closer. Leaves, by the way, to buy (not fall) in stock ritual supplies. More for fun like a monkey on top of the palm plant.
We make a "wall bars". My husband knocked together just such a structure:
18 framed under it (in the dug pit) 2 timber 50x100 - died.
19 Then, in the tool bar to make holes for the cuttings from the shovel, which now acts as a ladder. The bottom of the timber coated with bitumen (so as not rotten).
20, the design build and install to its rightful place:
21, issue price
Not all built, but let's count of about:
Bruce 100x100 length 6 m (can be smaller) - using 6 pieces, but will need more - the price of 250 rubles. apiece.
Bar 50x50 was in there, I do not remember how much was used - about 4 pcs.
Boards on the floor are available (departure from previous construction)
Molded on the paneling - 2000 rubles. - 46 pieces out. However, a few pieces left.
Lining the roof - 15 pcs. 900 rubles. - 250 rubles. cbm
Cuttings 15 pcs. - 40p. (but we have sold to 30)
Various corners, screws, tools to drill (250 +75), etc.
Total: 5800 rubles.
You may also need to process the tar-Ground all timber + cement + sand.
But again, not all purchased: Need corners and wooden frames.
22 As you can see, everything is quite accessible to the average U-mamtsu!
And finally - a small bonus: a few ideas for the site in the country:
Posted in [mergetime] 1367553801 [/ mergetime]
Thank you I have everything! All the holidays!
Source: