Construction budget baths

Today I will try to tell you about our Batey old idea that we have realized this summer! On Yap often threads about construction there, he read them with pleasure, so I think not cast aside tomatoes, if its too rukozhopstvo show!
17 photos



Photos of stages of construction there, so try to briefly describe the process indicating certain sums spent on the construction site.



And so: Bath 4, 2x3, 6 on the external dimension on the concrete pad from keramzitoblokov. The budget was limited, so we decided to choose this option. First they dug a pit 4, 5h4h0 6 for the foundation pit for the fence and 2, 5 meters depth for wastewater. At the bottom of the pit should be laid geomembrane to distribute the load and the wheels 7 of KAMAZ in the well instead of concrete rings. Spread communication and pour concrete M200. The pillow is ready, the price of about 30 tr



We spread the base of red, baked bricks and pick up the walls of the units (380 units x 40 rubles = 15200r), the partition between the steam room and a waiting room of the same burnt bricks. The stove with a pipe 14 m3 - 7500r.



Boards on the floor and the rafters were left from last year, when they built the house, and the iron on the roof, too, there remains so much money xs.))) On the roof of the cake from the vapor barrier, insulation and basalt substrates for floor heating. On the roof trapezoidal sheet CC10. Near the bath seen boxes with stones: and talkohlorit gabbrodiabaz toad strangled jadeite take)))



Electrical wiring is the simplest: 1 switch, 1 socket, 2 lamps, took the lead NYM 2x1, 5 in triple insulation, grabbing his eyes!



Stitched up the ceiling and walls steam substrate for underfloor heating 3 mm, with air cushion between the wall and the substrate - 5 cm. On the walls of pine paneling, ceiling - lime, so that the head does not drip resin)))



In the dressing room for the spring-summer and autumn hung water heater 50 liters, so you can not flooding the room and take a shower in the evening or in the morning to wash. The water heater is connected to the well (n.) Via the pumping station. In winter have disabled it, there is a well, shabby buckets)))



No sooner had the course to finish everything, everything, even the flooring is needed on the floor and shelves is not only a shop, but it's all set up, and most importantly, that our dream came true, with our own hands, and pleasure for the whole family! So, as the saying goes, "The eyes are afraid, but the hands are doing!»



The budget of the entire construction of approximately 90 tr, fun - priceless !!!



11



12



13



14



15



16 This Saturday adopt procedures)))



17. But such a house built in the last year!)))
I do everything with the number of photos a little bit wrong, you can ask questions and kicking !!! Thank you !!!)))



Source: