546
Do not get old soul pensioners (30 photos)
Grandmother builds his house by herself. She was 60 years old!
On the timing and pace of construction:
I began to dig a hole under the foundation on August 13 completed the surface finish in the middle of November oktyabrya.Do engaged floor and interior wall cladding.
On the financial cost.
Bought: frame with an opening window in the wall opposite the door - 1, 5 tr,; iron on the roof - 3, 5 m. p; Flooring - 2, 6 tr; utelitel URSA 18 sqm (2 packages) about 3 TR The rest of the spending on bunk class "C" (the cheapest with holes from knots) for the outer skin 3m, internal 2 m, and 2, 5 m in length.
More nails and different farnitura (lock, handles.) Plinth and planed planks to finish around 1 tr
Gravel was my side of the fence, for the foundation bought chopped curb for minuscule (20 p piece) .Eschё piece of glassine and roofing.
Total 16 t.r.s hook. (Bruce "for free" has got, however, 3 tr gone further in his carriage to "Bychkov" winter)
At all stages of the construction of a draw but my hands were not utilized.
General view with attached bath rooms I:
I tried to explain briefly the proposed material, if someone have any questions, ready to respond in detail. I apologize if you do not know any special construction terms, explain something incomprehensible.
Anticipating a doubt in my physical abilities, I consider it necessary to add that I was young Master of Sports of the USSR (in underwater sports),
Sports teacher, professional instructor scuba divers (scuba weighs 23 kg). All my life I try to preserve and maintain their physical
formu.Brusy, window frames, roofing iron rises to the top, using a sturdy table, stairs and ladder.
In 59 years, passed on the right, the third year I drive zhigulёnok.Foto makes the camera mobilnika.Na area is home to one with 2 dogs and a cat.
-
On the timing and pace of construction:
I began to dig a hole under the foundation on August 13 completed the surface finish in the middle of November oktyabrya.Do engaged floor and interior wall cladding.
On the financial cost.
Bought: frame with an opening window in the wall opposite the door - 1, 5 tr,; iron on the roof - 3, 5 m. p; Flooring - 2, 6 tr; utelitel URSA 18 sqm (2 packages) about 3 TR The rest of the spending on bunk class "C" (the cheapest with holes from knots) for the outer skin 3m, internal 2 m, and 2, 5 m in length.
More nails and different farnitura (lock, handles.) Plinth and planed planks to finish around 1 tr
Gravel was my side of the fence, for the foundation bought chopped curb for minuscule (20 p piece) .Eschё piece of glassine and roofing.
Total 16 t.r.s hook. (Bruce "for free" has got, however, 3 tr gone further in his carriage to "Bychkov" winter)
At all stages of the construction of a draw but my hands were not utilized.
General view with attached bath rooms I:
I tried to explain briefly the proposed material, if someone have any questions, ready to respond in detail. I apologize if you do not know any special construction terms, explain something incomprehensible.
Anticipating a doubt in my physical abilities, I consider it necessary to add that I was young Master of Sports of the USSR (in underwater sports),
Sports teacher, professional instructor scuba divers (scuba weighs 23 kg). All my life I try to preserve and maintain their physical
formu.Brusy, window frames, roofing iron rises to the top, using a sturdy table, stairs and ladder.
In 59 years, passed on the right, the third year I drive zhigulёnok.Foto makes the camera mobilnika.Na area is home to one with 2 dogs and a cat.
-