Hello everyone ...
Secret to anyone that if you buy a new home there are always errors that hides the seller.
The worst thing for when building a house, with the intention of selling it, takes a person who does not understand anything in it, and in addition more greedy.
Statement.
Worked as an electrician for many years, many have seen on a construction site, a lot of himself ...
kosyachit And after many years of experience, for himself became an expert.
Recently I was invited (via tenth friend) on an unfinished house, so to speak finish what not finish the mountain electrician.
He disappeared again, taking an advance of 30 m. Rubles.
What I saw in the house, aroused my hair from the tips.
Lay out 12 pictures, but not all that he managed.
(This image from the internet at home.) Let's start with the fact that:
Food outlets carried wire 3 * 2, 5 mm.
this is the optimal cross section for connection of mechanisms outlets.
in this house all the wires of 4mm.



than cherevato?
this cross section breaks down the clamping mechanisms.
but that's not all!
70% of outlets are a train! (It is two cores in one mechanism)
it's like two pencil-tip in your ear ... I apologize for such an example.
and that's not all! 80% of the boxes are installed crooked.



loop after the air conditioner.



and that's not all!
boxes plastered putty when installing outlets, they just fall out.
further more.
wiring in a house involves three wires it:
phase zero, the earth.
So, why is this land electrician fundamentally not connect.
and as the last muden or simply impostor bit off. \
what colors do not match, it's forgivable.



increase short wires for a good twist is not profitable, and bitten off more so.
In short, the wiring in the junk!
and this new Grooves, new wiring, work, plaster - 70 m. approx.

shields stick, so to speak not flush ...



Only good quality machines.
introductory cable disfigured and stretched.
4 shield.
even by the most conservative - 25 tons.



almost all the walls already plastered, but there are two, where one can see how the wire was laid.
it means only one when they drilled a hole under the mount suppose pictures ... Give wire.



this is a ground loop.
what is it for?
any equipment there live wire, he is in isolation.
occasionally insulation frays and touches the body !!! and it must be grounded.
effectiveness of grounding 30%
the life of one (1) year.



like beautiful columns?



in fact, they create one Doom so!



,

Posted in [mergetime] 1311363142 [/ mergetime]
and last:
concrete of very low quality.
plaster cove now.
about lights on zabore- without tears will not look.
All of this will be hidden filler, and will open in a year or two.
I voiced the same amount for him to rework what would it all worked in the 35 t.
he offered 12 tonnes.
on this we parted.
I have everything.
Sori for PS ashipki a hurry.)