Dear YaPovtsy want to share with you the experience gained in the construction of a septic tank with his hands in his cottage. In this case, the connection to the central communication difficult and very expensive. On this solve the problem on their own.
There will be several photo + text. On completion of the tell.
After studying internet was decided to build on such a scheme:





1. In the nearest hardware store gain concrete rings and cover them. (Pictured bender0099, other hand played a role in the day porter and other glove in flight)



2. After determining the place of the usual ring-Ground technology. Who does not explain the topic: the inside of the ring and the ring is removed the ground under its own weight gradually deepened.



dig ...



4. Put on the second ring that is already buried, and then continue to dig.



Self shade ;-)



6. When the upper ring was razed to the ground, set the cover.



7. Next to do one more well.



8. The second ring. (Pictured shade me and my faithful assistant)



8. During the digging of the second well I was not feeling up to the fact that I have been here for some digging. This explains the discovery I made at a depth of about 1 meter.



9. Well, what I found at a depth of about 1, 5 meters exposed me into shock!
It does not create more intrigue. You can express your assumption is not going to show you this (or rather it)