911
Repair in my apartment!
I decided to share with you pictures of smooth repair my 2-room apartment. Remembering seething shit, about the fact that the repair of the balcony did not own, just say, apartment repair was done probably a couple of years (since I work watches have a lot of money just was not), so the forces were involved in all possible I graft Papa Carlo, sawing, cutting grooves, dragged, friends, girlfriends, parents, relatives, etc. etc., as well as professionals who work (About UZHOS !!) for the money, well, I think you humble yourself)))
And so, we bought an apartment in a young family with grandparents, 10-15 years of ownership apartment anything it has not been done.
So there you go. As we stopped, immediately made repairs in the kitchen, unfortunately not zafotkal for repairs, but only after the installation of the kitchen, ie When the room was almost ready, but it is current with regards to cuisine.
There was a warm floor screed + electro, tiles on the floor + the wallpaper on the walls. The ceiling of plasterboard construction and in the middle of the suspended ceiling.
90 photos
Well, this photo you can see part of the ceiling, and then we have already put the hood.
Here sobsno ceiling itself, we are all invented, so you may well not like it, it's our first apartment.
Renovated us on a normal table is not enough money to continue to repair and we can not yet. Well, there wa delay will not, let's look at the work itself
Type of cuisine: awful fitted wardrobes, doors to the bathroom (left) from the time of construction of the house
First of all Strobl by transfer switches, everything is simple, rasshtrobil, boosted, and all smeared
Dismantling the cabinet with a beer koreshame))) can not yet assess the wretchedness repair
Case dismissed! Your attention: Super-door (her more iron, the second), the pink door to the hall, too, we liked)
First in line of bathroom: take out the door, the bathroom itself, all the plumbing change to the new (there is nothing interesting). Helps girlfriend wife :) Hole in the wall to the left - it buduyuschaya outlet so fell off a piece)
Strobl exit exhaust and recessed comb over buduyuschey bathroom
The most tedious job - otdalblivanie paint !!! PICK !!! Very hard sitting dog
Dub Rotband walls horribly awry
New risers. Was equal to the second side
Suddenly)
Then tile Polotenchik and suspended ceiling cloth. Not zafotal steps, I forgive. The wire from the wall to illuminate it in a locker above the sink (premeditated)
Show immediately the bathroom to her then did not return. And so, on the left is acrylic tub without screen, sink, there is a locker. Make and Fota could not, hardship with glass sink uzhos and acrylic bathtub aschsche paragraph.
That's how it became after a while, because on the counter had 10ooo rubles, which just was not there.
Toilet. He's tiny, so we decided to put built, it actually saves. Mount the wall, nothing fancy.
We go to the toilet without a door and yes, we have two animals
Ronvyaem wall outside podgotalvivaem to install doors. The photo showed a drop arrow
They put a door, a rare shit, but at the time the money podzakonchilis. We live so long) We are used
Toilet looked after the installation of the kitchen here so
Money appeared and we continue. Equaled more or less in the closet wall, not much, because tile adhesive dovyrovnyaem later. Make a mixture of: water + cement + PVA and applied to the wall, dlu better adhesion of tile adhesive. The paint as much as possible otdolbit necessary.
Everywhere
Dried up. Putting the frame under the body oil paint, covering all the pipes, etc. The front part will be made removable, to repair the toilet (anything can happen)
All levels)
Sticking the tiles, collect the ceiling, it turns out like this
Or so
Easy shelf above the toilet? No, there will be more. We see a removable "hatch" from the DSP tiles glued on him. Without this, no way. Then I was convinced
Made to order cabinet)
His wife did not like the front door directly opposite the entrance to the bedroom. Let's remake ?, grit. Come on, I say.
Remove both input shit-door, put a safe-door. Then I take a grinder, a pair of (sort of) and diamond wheels to cut a new door). Awful dirty and dusty work. In an open window in a room on the street seemed to have lit something
Done
So was
portable meter apartment. Parallel wiring to make room for the installation of multi-split air-conditioning system and the bathroom a good pull the cable for connecting the flow 5kW-foot cylinder, which hid under the bathtub. Counter hide in a beautiful vstarivaemy locker
Strobl new outlets, food and a place in the "box" warm floor, which will be in the hallway.
Pawson establish multi-split
Done
It is in the room, through the wall is obtained almost two indoor units.
Cooking pour screed on the corridor. Spread a reflective material, lay floor heating, anchoring and cut in place reflecting material between the wires so that the top tie was a connection with the bottom tie, the photo does not do much more
Fill beacons tie
Mesim bedroom, Kul do
Today, we spend the night away from home)) Since no access to a toilet or somewhere else there))
From the outlet with a bell is a bias to the kitchen, because there is a much lower level
Laying bricks strange old door who know think will pay attention
So
Immediately perform the alarm to no wires dangling around the apartment !!! Make them specialists if that
Finish with wires and gloss over all these things Rotband
We put the old back door, because New yet
Put the tiles, plastered joints - it turns out like this, this is the slope
Corridor
Type of cuisine
Becoming the second door - the requirement of private security, maintain an apartment
Sealed door to the film and start podgotavlivku corridor walls by wallpapering
Throwing wires in the ceiling lighting, contour and basic
Almost done
Again, there is no middle ground, but there is this: are the doors, wardrobe costs, the ceiling is collected, in addition to contour posdvetki.
Entrance to the apartment. No wires)
Shelves of plasterboard, plastered all the wallpaper, but the shelves inside are covered with white wallpaper and painted without texture
However, doors and other things in the kitchen came a glass table and chairs)
Wardrobe view from the kitchen
Wardrobe view from the room
Convenient entrance to the bedroom)
Then go to the gym. Remove the tie where it is necessary, because floor level "floats". During the dismantling of a piece of tie I fell to the neighbors and almost poverdil of the suspended ceiling. Marvels)) Êàî fixed it so that then fill with tie and you will not see
Lighthouses, lighthouses, lighthouses
On the street the night, while I pootdirayu wallpaper, well, do not sit around the same))
"The first went» ©
Knead and fill in those days got it all))) So then me nobody came))))
We spread out linoleum on the finished side and continue. To dry the finished side gave specialists do not worry, do not burst
Done. Gofra sticking out of the floor for the wires from the threshold to the cabinet telly, karoch see everything later.
Getting to do the design of the drywall on the wall opposite the entrance
Here's a
Came guys ceilings mounted. the first day of their current billet frame, as ceiling will be a two-tiered
Ceiling lamp left, you can do drywall. Primers, fillers, etc.
Making a shelf under the TV set. Gofra already recessed into the wall and smeared, its output is within this shelf
It turns out something like
The next day. One level of the ceiling stretched
The second level is stretched, put the chandelier and left. The ceiling is black and white.
Once burned bulb))))
View distance
Sticking wallpaper, they are also the two colors to show right now)
The second wall vanilla
Sticking to the ceiling skirting. Curbstone wallpaper paste for painting. If you look at the curb, you can see that there is all the wires, wi-fi, telephone etc.
I'm preparing for laying laminate. The film is a cork backing, all technology
Puts lining
Puts laminate
Done
And here is the finished shelf. Glass 10mm, papered with black film. I can not see anything inside. He raised his glass, and connect / disconnect you want !!!
Ready for habitation
Living
In the evening, so
All. Fresh ph No, because after the repair of the hall and the balcony had to sell the apartment in connection with the move to another city.
Thank you all, you can flood!
Source:
And so, we bought an apartment in a young family with grandparents, 10-15 years of ownership apartment anything it has not been done.
So there you go. As we stopped, immediately made repairs in the kitchen, unfortunately not zafotkal for repairs, but only after the installation of the kitchen, ie When the room was almost ready, but it is current with regards to cuisine.
There was a warm floor screed + electro, tiles on the floor + the wallpaper on the walls. The ceiling of plasterboard construction and in the middle of the suspended ceiling.
90 photos
Well, this photo you can see part of the ceiling, and then we have already put the hood.
Here sobsno ceiling itself, we are all invented, so you may well not like it, it's our first apartment.
Renovated us on a normal table is not enough money to continue to repair and we can not yet. Well, there wa delay will not, let's look at the work itself
Type of cuisine: awful fitted wardrobes, doors to the bathroom (left) from the time of construction of the house
First of all Strobl by transfer switches, everything is simple, rasshtrobil, boosted, and all smeared
Dismantling the cabinet with a beer koreshame))) can not yet assess the wretchedness repair
Case dismissed! Your attention: Super-door (her more iron, the second), the pink door to the hall, too, we liked)
First in line of bathroom: take out the door, the bathroom itself, all the plumbing change to the new (there is nothing interesting). Helps girlfriend wife :) Hole in the wall to the left - it buduyuschaya outlet so fell off a piece)
Strobl exit exhaust and recessed comb over buduyuschey bathroom
The most tedious job - otdalblivanie paint !!! PICK !!! Very hard sitting dog
Dub Rotband walls horribly awry
New risers. Was equal to the second side
Suddenly)
Then tile Polotenchik and suspended ceiling cloth. Not zafotal steps, I forgive. The wire from the wall to illuminate it in a locker above the sink (premeditated)
Show immediately the bathroom to her then did not return. And so, on the left is acrylic tub without screen, sink, there is a locker. Make and Fota could not, hardship with glass sink uzhos and acrylic bathtub aschsche paragraph.
That's how it became after a while, because on the counter had 10ooo rubles, which just was not there.
Toilet. He's tiny, so we decided to put built, it actually saves. Mount the wall, nothing fancy.
We go to the toilet without a door and yes, we have two animals
Ronvyaem wall outside podgotalvivaem to install doors. The photo showed a drop arrow
They put a door, a rare shit, but at the time the money podzakonchilis. We live so long) We are used
Toilet looked after the installation of the kitchen here so
Money appeared and we continue. Equaled more or less in the closet wall, not much, because tile adhesive dovyrovnyaem later. Make a mixture of: water + cement + PVA and applied to the wall, dlu better adhesion of tile adhesive. The paint as much as possible otdolbit necessary.
Everywhere
Dried up. Putting the frame under the body oil paint, covering all the pipes, etc. The front part will be made removable, to repair the toilet (anything can happen)
All levels)
Sticking the tiles, collect the ceiling, it turns out like this
Or so
Easy shelf above the toilet? No, there will be more. We see a removable "hatch" from the DSP tiles glued on him. Without this, no way. Then I was convinced
Made to order cabinet)
His wife did not like the front door directly opposite the entrance to the bedroom. Let's remake ?, grit. Come on, I say.
Remove both input shit-door, put a safe-door. Then I take a grinder, a pair of (sort of) and diamond wheels to cut a new door). Awful dirty and dusty work. In an open window in a room on the street seemed to have lit something
Done
So was
portable meter apartment. Parallel wiring to make room for the installation of multi-split air-conditioning system and the bathroom a good pull the cable for connecting the flow 5kW-foot cylinder, which hid under the bathtub. Counter hide in a beautiful vstarivaemy locker
Strobl new outlets, food and a place in the "box" warm floor, which will be in the hallway.
Pawson establish multi-split
Done
It is in the room, through the wall is obtained almost two indoor units.
Cooking pour screed on the corridor. Spread a reflective material, lay floor heating, anchoring and cut in place reflecting material between the wires so that the top tie was a connection with the bottom tie, the photo does not do much more
Fill beacons tie
Mesim bedroom, Kul do
Today, we spend the night away from home)) Since no access to a toilet or somewhere else there))
From the outlet with a bell is a bias to the kitchen, because there is a much lower level
Laying bricks strange old door who know think will pay attention
So
Immediately perform the alarm to no wires dangling around the apartment !!! Make them specialists if that
Finish with wires and gloss over all these things Rotband
We put the old back door, because New yet
Put the tiles, plastered joints - it turns out like this, this is the slope
Corridor
Type of cuisine
Becoming the second door - the requirement of private security, maintain an apartment
Sealed door to the film and start podgotavlivku corridor walls by wallpapering
Throwing wires in the ceiling lighting, contour and basic
Almost done
Again, there is no middle ground, but there is this: are the doors, wardrobe costs, the ceiling is collected, in addition to contour posdvetki.
Entrance to the apartment. No wires)
Shelves of plasterboard, plastered all the wallpaper, but the shelves inside are covered with white wallpaper and painted without texture
However, doors and other things in the kitchen came a glass table and chairs)
Wardrobe view from the kitchen
Wardrobe view from the room
Convenient entrance to the bedroom)
Then go to the gym. Remove the tie where it is necessary, because floor level "floats". During the dismantling of a piece of tie I fell to the neighbors and almost poverdil of the suspended ceiling. Marvels)) Êàî fixed it so that then fill with tie and you will not see
Lighthouses, lighthouses, lighthouses
On the street the night, while I pootdirayu wallpaper, well, do not sit around the same))
"The first went» ©
Knead and fill in those days got it all))) So then me nobody came))))
We spread out linoleum on the finished side and continue. To dry the finished side gave specialists do not worry, do not burst
Done. Gofra sticking out of the floor for the wires from the threshold to the cabinet telly, karoch see everything later.
Getting to do the design of the drywall on the wall opposite the entrance
Here's a
Came guys ceilings mounted. the first day of their current billet frame, as ceiling will be a two-tiered
Ceiling lamp left, you can do drywall. Primers, fillers, etc.
Making a shelf under the TV set. Gofra already recessed into the wall and smeared, its output is within this shelf
It turns out something like
The next day. One level of the ceiling stretched
The second level is stretched, put the chandelier and left. The ceiling is black and white.
Once burned bulb))))
View distance
Sticking wallpaper, they are also the two colors to show right now)
The second wall vanilla
Sticking to the ceiling skirting. Curbstone wallpaper paste for painting. If you look at the curb, you can see that there is all the wires, wi-fi, telephone etc.
I'm preparing for laying laminate. The film is a cork backing, all technology
Puts lining
Puts laminate
Done
And here is the finished shelf. Glass 10mm, papered with black film. I can not see anything inside. He raised his glass, and connect / disconnect you want !!!
Ready for habitation
Living
In the evening, so
All. Fresh ph No, because after the repair of the hall and the balcony had to sell the apartment in connection with the move to another city.
Thank you all, you can flood!
Source: