I built the house !!!
Construction took 8 months + lawns Forest
Development site
Undermining rubble
They took the measure 1.5 of the soil, lay a cloth construction, it's time to rock debris of various sizes
Structural reinforcement
200 mm foam under fire = special strength
Under a fireplace and brick walls, a bunch of valves
Heating, floor heating
Finally the floor))))
Doors, windows double glazed
Ceiling
Pipe sauna and fireplace with double chimney
Place fireplace
That fireplace
Here's what happened
Summer meet in a new home
Source:
Development site
Undermining rubble
They took the measure 1.5 of the soil, lay a cloth construction, it's time to rock debris of various sizes
Structural reinforcement
200 mm foam under fire = special strength
Under a fireplace and brick walls, a bunch of valves
Heating, floor heating
Finally the floor))))
Doors, windows double glazed
Ceiling
Pipe sauna and fireplace with double chimney
Place fireplace
That fireplace
Here's what happened
Summer meet in a new home