How to pick up a truck for the removal of construction waste
How to prepare a construction piece for export, and what to pay attention to. How to correctly determine which truck is necessary for the removal of construction debris under your volume. Registration of the application with the carrier, which is important to indicate for pricing.
739239
How to prepare a scaffold for removal
Preparation is one of the most important stages in the process of removing construction waste. For different types and types of scaffolding, their requirements for preparation. There are four types: bulk, solid small, solid large, and liquid construction (remnants of paint materials).
Bulk construction debris is packed in polypropylene bags weighing thirty-thirty-five kilograms (visually no more than two-thirds of the bag), in rare cases it is possible to load "from the ground" with shovels, but, in this case, a truck with a dump truck body is used and it is possible to drive directly to the place of loading.
Solid small-sized construction waste is also packed in polypropylene bags. The size of the individual unit does not exceed sixty centimeters. This type can be attributed to the fight of brick, foam block, cinder block and the like. As well as scrap drywall, OSB, plywood and pieces of board, profile, pipes (at the same time, the removal of construction debris in the form of boards can be without packaging into bags, but replaced by bundles).
Solid large, exported in bundles, if in the form of poles (profile, board and the like). Or each individual unit, in the case of planes (gypsum board, plywood and so on). The length of one unit should not exceed two meters, and is freely moved by one loader, without the risk of damaging walls and doors.
Liquid, in the form of paint materials, has special recycling requirements. Therefore, it is necessary to coordinate its preparation with the recycling company.
Packaging equipment should also be taken care of. When the removal of construction waste is carried out, in places of temporary storage (near the elevator and in the elevator cabin, on inter-storey areas when descending the stairs) should be laid out with cardboard or dense polyethylene, which should be prepared in advance, or agreed with the company exporting.
How to determine which truck is needed to remove construction waste.
In order to determine which transport is necessary directly for your removal of construction waste, you need to comply with the preparation requirements. Distribute truck types into three types:
Boos or Gazelle. Their carrying capacity is up to a ton of two hundred kilograms, but there may be a large cargo compartment. In the presence of scaffolding in bags, it is enough to count the amount and state reliable information. Bags with loading up to thirty-five kilograms can be no more than 35 pieces, and weighing 30 kg to forty pieces. The volume can be up to fourteen cubic meters.
A five-ton ZIL or GAZON type. This is a dump truck with a carrying capacity of up to five tons. Capacity in volume is inferior to low-tonnage beads, but, allows you to load the scaffold without packaging, embankment (using shovels).
KAMAZ. The largest in terms of carrying capacity of the demanded trucks, its carrying capacity is up to ten tons. There are also large trucks that take 20 tons, but they are rarely ordered. This dump truck includes from 220 to 250 bags.
How to properly apply for the removal of construction waste.
First of all, it is necessary to provide reliable and complete information to the carrier:
The amount of garbage removed, how many bags or volume.
Carriers are required or loading is performed by the client (in case of provision of loaders, you need to inform about the height (from which floor), the presence of an elevator)
Loading address
Date and time for which you need to provide the truck and / or loaders
All of the above information affects pricing. It is necessary to fix the conditions in writing, messages can be used using SMS, Viber or the like.
Information from the cargo-ok website
739239
How to prepare a scaffold for removal
Preparation is one of the most important stages in the process of removing construction waste. For different types and types of scaffolding, their requirements for preparation. There are four types: bulk, solid small, solid large, and liquid construction (remnants of paint materials).
Bulk construction debris is packed in polypropylene bags weighing thirty-thirty-five kilograms (visually no more than two-thirds of the bag), in rare cases it is possible to load "from the ground" with shovels, but, in this case, a truck with a dump truck body is used and it is possible to drive directly to the place of loading.
Solid small-sized construction waste is also packed in polypropylene bags. The size of the individual unit does not exceed sixty centimeters. This type can be attributed to the fight of brick, foam block, cinder block and the like. As well as scrap drywall, OSB, plywood and pieces of board, profile, pipes (at the same time, the removal of construction debris in the form of boards can be without packaging into bags, but replaced by bundles).
Solid large, exported in bundles, if in the form of poles (profile, board and the like). Or each individual unit, in the case of planes (gypsum board, plywood and so on). The length of one unit should not exceed two meters, and is freely moved by one loader, without the risk of damaging walls and doors.
Liquid, in the form of paint materials, has special recycling requirements. Therefore, it is necessary to coordinate its preparation with the recycling company.
Packaging equipment should also be taken care of. When the removal of construction waste is carried out, in places of temporary storage (near the elevator and in the elevator cabin, on inter-storey areas when descending the stairs) should be laid out with cardboard or dense polyethylene, which should be prepared in advance, or agreed with the company exporting.
How to determine which truck is needed to remove construction waste.
In order to determine which transport is necessary directly for your removal of construction waste, you need to comply with the preparation requirements. Distribute truck types into three types:
Boos or Gazelle. Their carrying capacity is up to a ton of two hundred kilograms, but there may be a large cargo compartment. In the presence of scaffolding in bags, it is enough to count the amount and state reliable information. Bags with loading up to thirty-five kilograms can be no more than 35 pieces, and weighing 30 kg to forty pieces. The volume can be up to fourteen cubic meters.
A five-ton ZIL or GAZON type. This is a dump truck with a carrying capacity of up to five tons. Capacity in volume is inferior to low-tonnage beads, but, allows you to load the scaffold without packaging, embankment (using shovels).
KAMAZ. The largest in terms of carrying capacity of the demanded trucks, its carrying capacity is up to ten tons. There are also large trucks that take 20 tons, but they are rarely ordered. This dump truck includes from 220 to 250 bags.
How to properly apply for the removal of construction waste.
First of all, it is necessary to provide reliable and complete information to the carrier:
The amount of garbage removed, how many bags or volume.
Carriers are required or loading is performed by the client (in case of provision of loaders, you need to inform about the height (from which floor), the presence of an elevator)
Loading address
Date and time for which you need to provide the truck and / or loaders
All of the above information affects pricing. It is necessary to fix the conditions in writing, messages can be used using SMS, Viber or the like.