Repair wall. Donetsk shelling Russian troops.

Gotor metal (proftruba 20h20h2mm and 40h20h2mm) Net twisted brush and treat the rust converter. Brew basket (pictured standing upside down)





Degreased and gruntuem 2 layer soil GF.





forward 20 hours and ready to paint: we clean problem areas sandpaper and degreased.



Enamel paint PF-115 in 2 layers (color selected by the principle of "what was at hand»).











Cook ground for counterweight (proftruba 40h20h2 and fittings 10mm)



Cook boom boom with fasteners (profiled tube 80h80h4, metal sheet 6mm)



Proftrubu welds with holes for mounting supports. Hole pitch 100mm. With their help, you can adjust the tilt of the boom. Boil need short welds (20-30mm) with breaks for cooling the metal. Otherwise, the beam lead.









Putting it all together for verification.











Gruntuem in 2 layers.







Beautiful as basket.

And here he is the time of testing.

As used chain hoist winch lifting capacity of 550 kg and a chain length of 6m.
Sling made of galvanized wire rope 6mm and secured in a homemade tee sheet metal 6 mm and wheel studs from brand car. To prevent injury, cables wrapped with tape reinforced at fixing rigging.
As a counterbalance to use bags with granite rubble of 25 and 50 kg.
All tested and works fine. Work much more convenient than PROMALP.
Hole in the wall closed shield of OSB and began to foam sheathing.
Managed to attach only 2 sheets, after which the work had to be suspended due to high winds and pounding Donetsk Russian troops.

in the meantime, the smoke from the rocket hit "point in" almost cleared.