Suburban rukozhop





Last year, we bought a villa near St. Petersburg and in the summer of this year we plan to send to parents and 3 year old son. Boy that would be active and to direct his energies in the right direction, it was decided to put on a children's section complex with fitness equipment (home is the wall bars, and he really likes spinning on the rings). Looking at the prices of finished complexes and prisvistnuv the number of zeros, I decided to do himself. After drawing in the program Google SketchUp sketch of the complex, and approve it for all interested parties, on the last weekend in April began to buy material. Since road in horticulture were closed, it was decided to carry construction materials to the sawmill on the trunk of a passenger car. For 4 flights council, benefit sawmill near. For the remaining 1, 5 days, together with the father drove the foundation and put the frame. Next, I worked alone.

To maximize the reduction in price support for the foundation did themselves. Old pipes by sawing fence into pieces of 1.2m. Because the strip-shaped n Gnehm glass.

20 photos.

Suburban rukozhop



To maximize the reduction in price support for the foundation did themselves. Old pipes by sawing fence into pieces of 1.2m. Because the strip-shaped n Gnehm glass.

Suburban rukozhop

Glass welded to the pipe. Though I did in my life a couple of times svarochnikom worked, but such a responsible job entrusted test.

Suburban rukozhop

These are the bars turned. For reference - if you buy in the store, the "glass" (or support for the post) for timber worth about 500re 100x100.

Suburban rukozhop

Stepping back from the neighbor's fence 1.7m and pre scrap for maximum pick open a hole in the ground, starting with a sledgehammer to drive support.

Suburban rukozhop

1.2m was very difficult to drive.

Suburban rukozhop

The next series is already done with the length of the column 0, 9m - became much easier to score.

Suburban rukozhop

07
Putting the frame.

Suburban rukozhop

08
All contractible rod 8. The ends of the supports working off treat.

Suburban rukozhop

09
For safety nut recessed

Suburban rukozhop

10
The frame is ready. That's what we had together over the weekend. The height of the 1st floor - 1, 6 m - for the convenience of the grandmother.

Suburban rukozhop

11
Next May for the one I started sheathing boards 100h25 frame.

Suburban rukozhop

12
At times it was snowing

Suburban rukozhop

13
I got up to the roof - it took 2 Ondulina sheet and 2 pcs. Skate 1m length.

Suburban rukozhop

14
Purchased board came to an end - that is, began to use.

Suburban rukozhop

15
By the end of May turned out that's a birdhouse)

Suburban rukozhop

16
By the end of May turned out that's a birdhouse).

Suburban rukozhop

17
Next weekend at the cottage could not get there, so gradually completed house on May 24-25. The weather was wonderful - the heat of 30 degrees. I think everything sanded with the nozzle on the drill, but it was very tiring and sanded only the place where the most is the contact. In the corner of the box, made with a folding bench seat that would hide the toys there.

Suburban rukozhop

18
At the bottom of the stairs of the old 2 bunk beds - I think where it attach.

Suburban rukozhop

19
Further, all treated like this antiseptic. After drying wood becomes dark brown.

Suburban rukozhop

20
Hung the rope, trapeze and gymnastic rings. In the sandbox sand scattered. On the wall hung a basketball hoop. Main customer enjoyed. Already he dragged his toys. While the 2nd floor will be closed for him - at the request of her grandmother - afraid to overlook. The following year, the annexe ladder. There are ideas on the rear wall to attach climbing hooks. Regarding prices, it left about 12 thousand pe. That's all I have finished.

Suburban rukozhop