Sochi Olympics construction





I had a chance to get to work on the Olympic venue.

As a person who is not indifferent to the outrage, decided to all that he saw, take a picture and put it here, with a few comments, a lot needs no comment.

I will not bother figures how much is spent on the construction site, and asked how much, and how much more is needed - a lot.

P.s. I think the topic of where the money of taxpayers.

Sochi Olympics construction



I will start from afar. This hill in Krasnaya Polyana, the length of slides was 300 meters. Some bastard, that is not called, has decided that it is necessary to cover up the freebie and dug three trenches.

Sochi Olympics construction

Construction in Sochi under the open sky.

Sochi Olympics construction

This guide rail for plaster, cost 20p per share.
After the passage of a bulldozer ...

Sochi Olympics construction

This, in their view - the trash. Firehose worth 3000 rubles for obvious reasons, was carefully transferred into the machine.

Sochi Olympics construction

Experience not spend on drink! It's not about these foreign experts.
Tile is laid crookedly.

There are two options:
1) To remove
2) to bribe

Sochi Olympics construction

About tiles - later on, pay attention to metal-tile.
Because it is possible to cover a shed, well, or doghouse ...

Sochi Olympics construction

Comrades, this timepiece main thing here is the memory further.
Chop wood - chips fly.
It is understood that the remains of the concrete where it is necessary to put.
Two cubes separately, each worth 4, 000 rubles

Sochi Olympics construction

That's bad luck, putty and cement disappeared.
The junk!

Sochi Olympics construction

We must be very harsh welder to use it.

Sochi Olympics construction

The check valve, worth 150,000 rubles. Scratched in a pile with hatches ...

Sochi Olympics construction

Let me remind you, this is the story of one object from 150 per week.

Sochi Olympics construction

The cranes are sold on the operation sites, do not hesitate ...

Sochi Olympics construction

Here's a ton of reinforcement loaded in Kamaz and taken away for scrap or someone's cottage even had no time to take a picture.
Vacationers do not choke saliva! I myself am shocked, only a little time to carefully Spies ...

Sochi Olympics construction

Concrete slab, worth 5,000 rubles, was buried.
Dimensions 5m * 5m. * 20cm. Perhaps no one needs

Sochi Olympics construction

Bruce size of 30cm * 30cm * 3 m. The cost of 1, 00 rubles. each. The car did not climb, and stealing improper, and in fact bury tractor for sure ...

Sochi Olympics construction

The Japanese did not survive this picture. After half an hour under the ground.

Sochi Olympics construction

Metal-tile, exposed beams and fittings. Bulldozer is like burying.

Sochi Olympics construction

As far as I know, 16 bridges are temporary, the quality - on the photo.
And do you have in the city once the bridge?

Sochi Olympics construction

There builders are so severe that the concrete poured harvested directly on concrete))
Oilcloth, to share it, no.

Sochi Olympics construction

Yesterday took off the concrete floor, taking into account the cost of paying workers + materials - 15.000 rubles

Sochi Olympics construction

Our country is so rich that we can afford to lay expensive materials, produced and delivered from the middle of the mountains in the tunnel construction.

Sochi Olympics construction

The alluvial deposits of these stones come across ... lovers of artifacts - read no further! - Crystals of semi-precious stones: rock crystal, calcite, gold.
Gold, for obvious reasons, very little without a photo. But calcite 60 kg stole carefully perevёz.

Sochi Olympics construction

As for the tiles. Taki first question: at whose expense?

Sochi Olympics construction

Lightning protection. Welders understand ...

Sochi Olympics construction

Temporary pipe for temporary cable was temporarily buried temporarily withdrawn temporarily. The cost of the work can only speculate.

As you probably know, it's - only a photo, I'm no expert in the embrace of an immense, but I know for sure - just a third of the money goes into oblivion due to the irresponsibility of many.

Behind this otklanivayus.

Sochi Olympics construction

Source: ">