447
How to put support
Once the power system of our motherland needed to hold a new transmission line.
Well it is necessary it should be. Who I will talk about how to put support for large crossing the Kama Reservoir. The length of the transition from reliance on one side to a support on the other side 2, 1 km.
So go. (15 ph)
1. That on the beach we have to throw the cable. The left is the old line and transitional support.
2. Digging the pit and begin to build the foundation for future support.
3. 4 feet support, 4 fudtamenta.
4. Get in the end that something
5.Stavim base of support.
6. bury the hell
7. Begin to gather support. In principle, nothing complicated, but ...
8. You may need to "spets.instrument." I have at hand was a 120-ton Liebherr. You can take something else.
9. On the other bank, too, do not sit back and prepare his footing, the size is a little smaller.
10. Well, we continue to collect her. The technology is simple. On the ground, gather pieces and lift from higher and higher. Nothing complicated.
11. Helping spets.instrumentom.
12.
14. Almost done.
15. Well, that's all. Reliance is ready for installation of the cables and receive Your Highness.
P.y. installation killed one installer. With a height of 115 m. It has broken wind.
Source:
Well it is necessary it should be. Who I will talk about how to put support for large crossing the Kama Reservoir. The length of the transition from reliance on one side to a support on the other side 2, 1 km.
So go. (15 ph)
1. That on the beach we have to throw the cable. The left is the old line and transitional support.
2. Digging the pit and begin to build the foundation for future support.
3. 4 feet support, 4 fudtamenta.
4. Get in the end that something
5.Stavim base of support.
6. bury the hell
7. Begin to gather support. In principle, nothing complicated, but ...
8. You may need to "spets.instrument." I have at hand was a 120-ton Liebherr. You can take something else.
9. On the other bank, too, do not sit back and prepare his footing, the size is a little smaller.
10. Well, we continue to collect her. The technology is simple. On the ground, gather pieces and lift from higher and higher. Nothing complicated.
11. Helping spets.instrumentom.
12.
14. Almost done.
15. Well, that's all. Reliance is ready for installation of the cables and receive Your Highness.
P.y. installation killed one installer. With a height of 115 m. It has broken wind.
Source: