596
My version of warming balcony
Will be 46 photos.
to
Version 1
severe foaming slots long before the upgrade
And so it began :)
the first thing that came to mind - to collect on the model of layers and count on it the volume of material and the amount of costs (all sizes meet up to see the original)
in the picture that I wanted to say ...
Strengthening XPS panels on the "fungi" and foaming seams 1
Strengthening XPS panels on the "fungi" and foaming seams 2
Strengthening XPS panels on the "fungi" and foaming joints 3
Strengthening XPS panels on the "fungi" and foaming seams 4
Strengthening XPS panels on the "fungi" and foaming joints 5
Strengthening XPS panels on the "fungi" and foaming joints 6
And this is now the installers put the window / door ... no comment
ceiling.
Commission
Trim excess foam 1
Trim excess foam 2
Trim excess foam 3
Pasting of double-sided tape 1
Pasting of double-sided tape 2
Pasting of double-sided tape 3
Pasting a heater / paroizolyatora foil 1
Pasting a heater / paroizolyatora foil 2
Pasting a heater / paroizolyatora foil 3
Pasting a heater / paroizolyatora foil 4 (not enough - have gained a similar garbage stocks)
Plywood on the floor as a base for the laminate as the elevation changes and the small not like the knees rest against the window sill
Installing the rails / beams under the skin 1
Installing the rails / beams under the skin 2
Installing the rails / beams under the skin 3
Installing the rails / beams under the skin 4
Installing the rails / beams under the skin 5 (later step)
Installing the rails / beams under the skin 6 (dependent - you need to come up with the sill from scrap)
Installing MDF panels 1
Installing MDF panels 2
Installing MDF panels 3
Installing MDF panels 4 (etc)
To simplify mounting + that have had to cut less, decided to build a wall timbers :)
Ceiling Bulo purchased several plastic panels for walls bo cheaper
Installing the slopes 1
Installing the slopes 2
Installing the slopes 3
That's what happened. Further, a laminate + 1 plinth
That's what happened. Further, a laminate + plinth 2
Fittings for large (2 hooks set 300r + drill to punch 160)
Test drive the observation tower (collected separately: PVC pipe, 30 meters cotton-hemp rope +45).
shelves - remnants of the plywood floor.
More
Posted in [mergetime] 1393341025 [/ mergetime]
Total 20 sput, including the purchase of certain tools and the delivery of the material to rise + a few days of work
(Moscow - to understand the "value" of work)
"Master," we asked for the same job 50tyr.
Then there was a small dokuplen 1kW heater to the far wall with a small thermostat in El Dorado for tyschurubley so there was no condensation and heats the air ...
At the end of winter, the doors were always open to the balcony, and so warm. Condensate was never.
I have finished.
Source:
to
Version 1
severe foaming slots long before the upgrade
And so it began :)
the first thing that came to mind - to collect on the model of layers and count on it the volume of material and the amount of costs (all sizes meet up to see the original)
in the picture that I wanted to say ...
Strengthening XPS panels on the "fungi" and foaming seams 1
Strengthening XPS panels on the "fungi" and foaming seams 2
Strengthening XPS panels on the "fungi" and foaming joints 3
Strengthening XPS panels on the "fungi" and foaming seams 4
Strengthening XPS panels on the "fungi" and foaming joints 5
Strengthening XPS panels on the "fungi" and foaming joints 6
And this is now the installers put the window / door ... no comment
ceiling.
Commission
Trim excess foam 1
Trim excess foam 2
Trim excess foam 3
Pasting of double-sided tape 1
Pasting of double-sided tape 2
Pasting of double-sided tape 3
Pasting a heater / paroizolyatora foil 1
Pasting a heater / paroizolyatora foil 2
Pasting a heater / paroizolyatora foil 3
Pasting a heater / paroizolyatora foil 4 (not enough - have gained a similar garbage stocks)
Plywood on the floor as a base for the laminate as the elevation changes and the small not like the knees rest against the window sill
Installing the rails / beams under the skin 1
Installing the rails / beams under the skin 2
Installing the rails / beams under the skin 3
Installing the rails / beams under the skin 4
Installing the rails / beams under the skin 5 (later step)
Installing the rails / beams under the skin 6 (dependent - you need to come up with the sill from scrap)
Installing MDF panels 1
Installing MDF panels 2
Installing MDF panels 3
Installing MDF panels 4 (etc)
To simplify mounting + that have had to cut less, decided to build a wall timbers :)
Ceiling Bulo purchased several plastic panels for walls bo cheaper
Installing the slopes 1
Installing the slopes 2
Installing the slopes 3
That's what happened. Further, a laminate + 1 plinth
That's what happened. Further, a laminate + plinth 2
Fittings for large (2 hooks set 300r + drill to punch 160)
Test drive the observation tower (collected separately: PVC pipe, 30 meters cotton-hemp rope +45).
shelves - remnants of the plywood floor.
More
Posted in [mergetime] 1393341025 [/ mergetime]
Total 20 sput, including the purchase of certain tools and the delivery of the material to rise + a few days of work
(Moscow - to understand the "value" of work)
"Master," we asked for the same job 50tyr.
Then there was a small dokuplen 1kW heater to the far wall with a small thermostat in El Dorado for tyschurubley so there was no condensation and heats the air ...
At the end of winter, the doors were always open to the balcony, and so warm. Condensate was never.
I have finished.
Source: