Kuzbass mines
Mine them. November 7 is developing coal seams underground way Leninsk-Kuznetsky coal deposit. Mining operations are carried on a layer Baykaimskomu (-280 meters) and Nadbaykaimskomu-2. Most of the field is located directly within the city of Leninsk-Kuznetsk. Mine was founded in 1931 and is one of the oldest enterprises of the Lenin coal mine.
For 80 years the miners have extracted more than 105 million. Tons of coal and walked about 1,000 kilometers of mine workings.
The mine performed full konveyrizatsiya. The length of the main conveyor lines - 8 kilometers.
As a subsidiary of transport used rail road "Shtrekenkuli-800" firm "Scarf", rail and monorail road diesel production company "Ferrit»
Mine explosion hazard of coal dust on the gas content of mine workings - sverhkategoriynaya. Spontaneous combustion of coal available. Mine field has 4 barrel.
The system of ventilation shafts single, method of ventilation - injection-sucking.
Control Panel shearer KGE-750 production of Polish firm "Famur»
Machine Weight: 86 tons
Excavation site №1384 located in the southern part of the field to evade Baykaimskogo formation. Front lava - 290 m, the length of the post within the boundaries of mining is 1270 m.
166 Twenty-five clubs lining of KM-142 and the face conveyor.
And of course specialists in their field ...
For 80 years the miners have extracted more than 105 million. Tons of coal and walked about 1,000 kilometers of mine workings.
The mine performed full konveyrizatsiya. The length of the main conveyor lines - 8 kilometers.
As a subsidiary of transport used rail road "Shtrekenkuli-800" firm "Scarf", rail and monorail road diesel production company "Ferrit»
Mine explosion hazard of coal dust on the gas content of mine workings - sverhkategoriynaya. Spontaneous combustion of coal available. Mine field has 4 barrel.
The system of ventilation shafts single, method of ventilation - injection-sucking.
Control Panel shearer KGE-750 production of Polish firm "Famur»
Machine Weight: 86 tons
Excavation site №1384 located in the southern part of the field to evade Baykaimskogo formation. Front lava - 290 m, the length of the post within the boundaries of mining is 1270 m.
166 Twenty-five clubs lining of KM-142 and the face conveyor.
And of course specialists in their field ...