456
Frame pool on the site: how to cook pad under pool
Frame technology a perfectly taken root in the country. It is quickly and easily constructed structures, which are almost all collected personally. But a prerequisite for the normal functioning is a well-prepared space under the pool. How is this done?
Types frame pools Today to replace capital pools built in areas of a private home, came practical and easy to build frame pools. Manufacturers produce several types of frame pools allows you to buy a pool frame for the garden:
• fixed
• all-season
• seasonal.
Pools stationary Stationary karkasnyi multisection. Sections made from different materials – plastic, steel and aluminum. Construction of stationary pools hard enough. The installation is carried out once without subsequent seasonal disassembly using bolt and interlocks.
Stationary pools for the garden frame deep with a height of 2.5 m. the shape of the bowl stationary swimming pool is of simple geometry and complicated curved and in the form of polyhedra.
The design of the pool, sometimes containing up to 20 tons of water, reinforce the metal wall and protect with a layer of polymer.
Filled with water the design differentiates impressive weight, so preparing the site for the serious pool. A pop-up question: "what to put frame pool" will entail a lot of additional costs that increase the cost of installation to the space of numbers.
All seasons pools all seasons pools are designed for virtually any season of the year, so they are not dismantled for the winter. From seasonal pools they are more potent side wall (0.8 mm).
The frame is strengthened steel hull, but the frame supports and cross members to withstand the forces of frost heaving of frozen water. Low pit area for pool season a few times tamped and covered with sand and rubble.
But year-round and seasonal portable pools are able to dramatically reduce installation costs.
Seasonal frame pools collect and install on the site at the beginning of the summer season. Structurally, seasonal pools consist of the following elements: seasonal • team frame from metal pipes
• connecting components and assemblies
• the pool in the form of a bag.
Frame seasonal pool provides the durability and strength, keeping the shape of the bowl after filling with water. The weight of the structure, seasonal pools is low and can reach 5-7 tons. However, this does not remove the question of equipment platforms for the installation of a pool.
Assessment of soil Before to prepare the site for subsequent installation of a pool, it is recommended to assess the condition of the soil. For stationary frame pool condition determining the quality of the soil is necessary.
The ideal assessment of the soil and the soil at the site is the determination of granulometric composition, providing specific data on the quality of the soil.
If possible to evaluate the granulometric composition is missing, and you intend to install a seasonal swimming pool, we can restrict visual inspection of the site.
Preparation of the site for the pool preparations to create platforms under frame swimming pool consist of the following stages:
• the location of the pool
• layout and marking the site
• removal of vegetation layer
• create a sand cushion and its rammer
• stacking the underlying film.
the choice of space for a pool location Selection frame pool should be dictated by the available space, the close proximity of a power source, water source or the possibility of laying water mains, location of discharge of water from the pool as a replacement.
Such criteria are reasonable because they will ensure the normal operation of a frame pool.
The place chosen for the site prepare: clean of solid foreign objects. Further activities will depend on the type of construction frame pool. For some models it will be necessary to dig a pit, and for others to limit the stacking of the underlying layer.
layout and markup of the site in addition, at this stage, preparatory work aimed at clarifying the planning area, namely the tilt angle, which allows to make a conclusion about how to make the pad under the pool.
Will show that if the angle of incline of the ground will exceed 5 degrees, then filling the pool to the brim will be problematic. Actions for the planning area include the following:
• vertical and horizontal layout with peg
• removal of topsoil
• covering the surface with sand and gravel
• alignment backfill using rules
• compaction of filling in plot 2 times
• laying of PVC film followed by a layer of polystyrene
• laying the underlying cloth included with the pool from the manufacturer.
The layout area depends on the shape of a frame pool. For rectangular pools this is a simple configuration, and for round you need to hold the circle on the ground using pegs and attached to it at the end of the line.
removal soil Removal soil topsoil is required. Otherwise, vegetation will be created excellent conditions, it will germinate under the bottom of the pool.
The vegetable soil layer removed by means of trimming sod with a shovel bayonet. Then deepen the soil to a height of 40 mm, to make room for sand bags and plates. After removal of vegetation layer produced by the control of the verticality and horizontality of the site. The control should detect the areas of raised or lowered areas that need to be eliminated through the creation of sand bags.
the creation of sand bags To create podshivnogo layer is fine sand that is distributed on the thickness of 20-30 cm to Level the surface of the sand cushion is recommended by the rule in the direction of movement from the center to the edges of the site. The next step after creating podshivnogo layer is its compaction using hand rammers.
The quality of the tamping should match the density of the sand layer of the road surface.
If necessary, the tamper produced for 2 passes.
the styling of the film and of the underlying cloth After carrying out the backfilling and tamping of the plot shrouded with PVC film. The joints fastening the strips of film secured with tape.
The final arrangement of the platforms under frame swimming pool is laying an underlying layer, which is incorporated by the manufacturer in the package.
Ideally, this should be a flat surface that was created. You can now start the installation of the pool.
More detailed and extensive information shown here.
SUBSCRIBE to OUR youtube channel that allows you to watch online, download from YouTube free video about the recovery, the rejuvenation of man. Love for others and ourselves, as the feeling of high vibrations — an important factor for improvement
Put LIKES and share with your FRIENDS!
www.youtube.com/channel/UCXd71u0w04qcwk32c8kY2BA/videos
I https://www.facebook.com//
P. S. And remember, only by changing their consumption — together we change the world! ©
Join us in Facebook , Vkontakte, Odnoklassniki
Source: svouimirukami.ru/articles/karkasnyj-bassejn-na-uchastke-gotovim-ploshhadku-pod-bassejn.html
Types frame pools Today to replace capital pools built in areas of a private home, came practical and easy to build frame pools. Manufacturers produce several types of frame pools allows you to buy a pool frame for the garden:
• fixed
• all-season
• seasonal.
Pools stationary Stationary karkasnyi multisection. Sections made from different materials – plastic, steel and aluminum. Construction of stationary pools hard enough. The installation is carried out once without subsequent seasonal disassembly using bolt and interlocks.
Stationary pools for the garden frame deep with a height of 2.5 m. the shape of the bowl stationary swimming pool is of simple geometry and complicated curved and in the form of polyhedra.
The design of the pool, sometimes containing up to 20 tons of water, reinforce the metal wall and protect with a layer of polymer.
Filled with water the design differentiates impressive weight, so preparing the site for the serious pool. A pop-up question: "what to put frame pool" will entail a lot of additional costs that increase the cost of installation to the space of numbers.
All seasons pools all seasons pools are designed for virtually any season of the year, so they are not dismantled for the winter. From seasonal pools they are more potent side wall (0.8 mm).
The frame is strengthened steel hull, but the frame supports and cross members to withstand the forces of frost heaving of frozen water. Low pit area for pool season a few times tamped and covered with sand and rubble.
But year-round and seasonal portable pools are able to dramatically reduce installation costs.
Seasonal frame pools collect and install on the site at the beginning of the summer season. Structurally, seasonal pools consist of the following elements: seasonal • team frame from metal pipes
• connecting components and assemblies
• the pool in the form of a bag.
Frame seasonal pool provides the durability and strength, keeping the shape of the bowl after filling with water. The weight of the structure, seasonal pools is low and can reach 5-7 tons. However, this does not remove the question of equipment platforms for the installation of a pool.
Assessment of soil Before to prepare the site for subsequent installation of a pool, it is recommended to assess the condition of the soil. For stationary frame pool condition determining the quality of the soil is necessary.
The ideal assessment of the soil and the soil at the site is the determination of granulometric composition, providing specific data on the quality of the soil.
If possible to evaluate the granulometric composition is missing, and you intend to install a seasonal swimming pool, we can restrict visual inspection of the site.
Preparation of the site for the pool preparations to create platforms under frame swimming pool consist of the following stages:
• the location of the pool
• layout and marking the site
• removal of vegetation layer
• create a sand cushion and its rammer
• stacking the underlying film.
the choice of space for a pool location Selection frame pool should be dictated by the available space, the close proximity of a power source, water source or the possibility of laying water mains, location of discharge of water from the pool as a replacement.
Such criteria are reasonable because they will ensure the normal operation of a frame pool.
The place chosen for the site prepare: clean of solid foreign objects. Further activities will depend on the type of construction frame pool. For some models it will be necessary to dig a pit, and for others to limit the stacking of the underlying layer.
layout and markup of the site in addition, at this stage, preparatory work aimed at clarifying the planning area, namely the tilt angle, which allows to make a conclusion about how to make the pad under the pool.
Will show that if the angle of incline of the ground will exceed 5 degrees, then filling the pool to the brim will be problematic. Actions for the planning area include the following:
• vertical and horizontal layout with peg
• removal of topsoil
• covering the surface with sand and gravel
• alignment backfill using rules
• compaction of filling in plot 2 times
• laying of PVC film followed by a layer of polystyrene
• laying the underlying cloth included with the pool from the manufacturer.
The layout area depends on the shape of a frame pool. For rectangular pools this is a simple configuration, and for round you need to hold the circle on the ground using pegs and attached to it at the end of the line.
removal soil Removal soil topsoil is required. Otherwise, vegetation will be created excellent conditions, it will germinate under the bottom of the pool.
The vegetable soil layer removed by means of trimming sod with a shovel bayonet. Then deepen the soil to a height of 40 mm, to make room for sand bags and plates. After removal of vegetation layer produced by the control of the verticality and horizontality of the site. The control should detect the areas of raised or lowered areas that need to be eliminated through the creation of sand bags.
the creation of sand bags To create podshivnogo layer is fine sand that is distributed on the thickness of 20-30 cm to Level the surface of the sand cushion is recommended by the rule in the direction of movement from the center to the edges of the site. The next step after creating podshivnogo layer is its compaction using hand rammers.
The quality of the tamping should match the density of the sand layer of the road surface.
If necessary, the tamper produced for 2 passes.
the styling of the film and of the underlying cloth After carrying out the backfilling and tamping of the plot shrouded with PVC film. The joints fastening the strips of film secured with tape.
The final arrangement of the platforms under frame swimming pool is laying an underlying layer, which is incorporated by the manufacturer in the package.
Ideally, this should be a flat surface that was created. You can now start the installation of the pool.
More detailed and extensive information shown here.
SUBSCRIBE to OUR youtube channel that allows you to watch online, download from YouTube free video about the recovery, the rejuvenation of man. Love for others and ourselves, as the feeling of high vibrations — an important factor for improvement
Put LIKES and share with your FRIENDS!
www.youtube.com/channel/UCXd71u0w04qcwk32c8kY2BA/videos
I https://www.facebook.com//
P. S. And remember, only by changing their consumption — together we change the world! ©
Join us in Facebook , Vkontakte, Odnoklassniki
Source: svouimirukami.ru/articles/karkasnyj-bassejn-na-uchastke-gotovim-ploshhadku-pod-bassejn.html