733
Unexpected construction of cottages
It happened in February 2014. The next gathering with friends at the cottage, sauna and emotional conversations led to believe ... One of the companions, Grisha, was a piece of land of 4, 2 weave, which were empty for seven years. At one time, it was purchased from our friend Dima under construction, but a successful business Grisha, gave him the opportunity to buy a finished house with a sauna! They all hung out successfully every summer in one gardening a five minute walk from each other.
And mys, let's Sanya, we'll give you the land, to build, and how you can calculate. Long before that, my wife and I have planned to expand the living space, putting -VA ... Two children, daughter 4 years and 5 months now my little boy, we bowed to the open air and 2 April it started. House first experience -0, 100 health, desire +150 (kids)!
64 photo.
Design
beginning
aimed
We turn piles
All hardboiled
House arrived at KAMAZ trailer
unloaded
build
build 1
build 2
build 3
build 4
build 5
build 6
hut is
Log in C / C
We pass by and get into the living room-kitchen
1 fl
He
still he
ponoramka his own ...
ponoramka from another angle
2nd floor, bedroom (future)
Children, too, in the future
From the nursery. is no partitions
closed circuit
brought the ring, will dig a well, the process is not filmed, I was away
chopping wood at the site
couple doing
plodorodku shoot for ...
... What would be evenly rastoschit clay dug out of the well 6 rings
priezali dig, install a septic tank and draw the water into the house
Process
34
35
train baby
subtotal
And then, working postiliv solid board on the house on the floor, put on their walls after they were narrowed, had to make cuts along the walls, open floor, it was no more lag, wiser lags, collect all ... well the children did poorly in the construction )))
39
40
as without it ...
And mys, let's Sanya, we'll give you the land, to build, and how you can calculate. Long before that, my wife and I have planned to expand the living space, putting -VA ... Two children, daughter 4 years and 5 months now my little boy, we bowed to the open air and 2 April it started. House first experience -0, 100 health, desire +150 (kids)!
64 photo.
Design
beginning
aimed
We turn piles
All hardboiled
House arrived at KAMAZ trailer
unloaded
build
build 1
build 2
build 3
build 4
build 5
build 6
hut is
Log in C / C
We pass by and get into the living room-kitchen
1 fl
He
still he
ponoramka his own ...
ponoramka from another angle
2nd floor, bedroom (future)
Children, too, in the future
From the nursery. is no partitions
closed circuit
brought the ring, will dig a well, the process is not filmed, I was away
chopping wood at the site
couple doing
plodorodku shoot for ...
... What would be evenly rastoschit clay dug out of the well 6 rings
priezali dig, install a septic tank and draw the water into the house
Process
34
35
train baby
subtotal
And then, working postiliv solid board on the house on the floor, put on their walls after they were narrowed, had to make cuts along the walls, open floor, it was no more lag, wiser lags, collect all ... well the children did poorly in the construction )))
39
40
as without it ...