Walking monsters at the plant "Sіrka"

About the former factory for the production of sulfur "Sіrka" near Novoyavorivsk I wrote earlier; Now finally it is the turn to show pictures of the tastiest that now remains at the plant - two large draglines, previously worked in the local quarry.

Writes Oleg Totskiy: tov-tob.livejournal

30 photos + text

1. That they are handsome. Between them is deploying boom in our direction, valve BC-1000, and the rear lies a lake on the site of a former quarry. The depth of the lake up to 80 m. The techniques used to be longer, but now there are only two large draglines and odiin is less.





2. draglines ESH 20.90 Uralmash production. The figures indicate bucket capacity (in cubic meters) and length of the arrows, respectively. Total of 57 pieces were produced.



3.



4. Beyond the trees hiding the younger brother EL 6/45 Novokramatorsk production plant. The numbers mean the same thing.



5.



6. Tower Crane BC-1000 is on the main hook load 63 t., In the sub - 12, 5 m. Lifting height of 90 m. The most commonly used in the construction of large industrial facilities. These cranes can still be seen in the abandoned construction site of the 5th and 6th unit of the Chernobyl nuclear power plant.



7. "Scarce" EL 6/45. In general, then there's nothing special about him more than anything and will not be, because highlight of the program - the other two excavator.



8. ESH 20.90.



9. The excavator has the capability of digging to a depth of 42 m, and removal of soil to a height of 38 m. For one cycle (duration 1 minute), you can transfer up to 63 t. Ground.



10. A bit of me in the bucket for the scale:



11. The stationary excavator is "belly" on the ground. This is done in order to more evenly distribute the load (operating weight of excavator - 1690 m.) And to increase stability. If necessary, move the entire weight of the excavator is transferred to the anchor shoes ("skiing"), controlled by two hydraulic cylinders. The excavator is lifted above the earth moves for some distance and then sits on the "belly". Then, the support shoes are carried forward and the whole procedure is repeated until such time until the machine will move in trebuyumuyu point. Thus excavator can move at speeds up to 200 meters per hour.



12. For the hydraulic system contains 18 tons of oil.



13. Now let something go up higher.



14. 90-meter boom:



15. ES-6/45 for the boom older brother:



16. The diameter of the cable - more than a dozen millimeters.



17.



18.



19.



20. On the roof of the engine room:



21. Cable drive the bucket:



22. EL 6/45 seems small, even next to the 20-cc bucket:



23. Arrow:



24. winches to lift the bucket up:



25. The extent of detail dazzling. In the picture posing favorite Anatoly, thanks to which became available this trip.



26. Around the way, good scenery:



27. The second ES 20.90:



28.



Source: http: //