Jobs at work is not for work





We decided in the office to make repairs on their own. Basement room. Sorry, there is no photo of the room in its original form, but I think, and so it will be clear that the room was in a terrible state. Plaster fray, the fungus on the walls, the floor at the left wall fell, well, etc.
ps Photos from mobile phones.

23 photos + text

1. Begin with the floor. They tore the old parquet flooring, fiberboard and lags, or rather what was left of them (all the rotten). "Lighthouses" old left, the only thing that stood firmly. We throw logs across the room to the "beacons". Boards was short (we were given them for free :-), so I had to step up. It would be better put them on edge, but then the floor will rise strongly. Considering that "beacons" were quite a heap, it was decided to lay flat on the joists twisting them around the perimeter of each other.

Jobs at work is not for work



2. A new door was already))) ...

Jobs at work is not for work

3. Puts the second layer across the bottom, the distance between the boards do about 35-45sm.

Jobs at work is not for work

4. Expose all on the level, podklinivaya where necessary. Paul is ready for laying the OSB.

Jobs at work is not for work

5. For the floor, it was decided to use the stove OSB-3. You can use plain chipboard, but since it is a basement (damp), took OSB.

Jobs at work is not for work

6. We reserve 3mm gap between the plates and the walls around 10mm. It would be better to lay the plate to the side seam did not go on the same line, but given that he remained not quite a big gap, we did not bother.

Jobs at work is not for work

7. Next, assemble the frame for plasterboard.

Jobs at work is not for work

8. The beam going along the left wall and ceiling will also sheathe gypsum.

Jobs at work is not for work

9. stretching cable outlet under the phone, internet, air conditioning and begin to sew up with gypsum.

Jobs at work is not for work

10. Somehow ...

Jobs at work is not for work

11. There were remnants of the ordinary gypsum wall, then bought additional waterproof.

Jobs at work is not for work

12. Change the window. After removing the old window, it appears that the gaps are large, so use pieces of cardboard, so that the foam does not fall.

Jobs at work is not for work

13. The old window with bars inside.

Jobs at work is not for work

14. The wall is quite thick (1m), and has decided to sew up the battery, so the windowsill has turned 50 cm.

Jobs at work is not for work

15. plastered joints and screws.

Jobs at work is not for work

16. And yet ...

Jobs at work is not for work

17. Holes for lattices.

Jobs at work is not for work

18. Shpaklyuem. The most hard work, I did not hit her, went on vacation.

Jobs at work is not for work

19. clobbered plaster (I'm already back).

Jobs at work is not for work

20. Putting ceiling. Sorry, but the installation process to capture forgotten.

Jobs at work is not for work

21. Install the trays for fire alarm sensors.

Jobs at work is not for work

22. Clay wallpaper.

Jobs at work is not for work

Source: ">