Repairs in the bathroom

Hello, about a year ago did a report on the repairs to his room.

And then finally I got up probably the most difficult in terms of repair of the apartment - bathroom. This topic will discuss the bathroom, and soon will make a report on the repairs to the toilet.

It will be about 62 pictures.

All questions and answers at the end.

And so, let's go!





1. Disassemble the old ventilation system



2. Details of the new system



3. And all this put in place



4.



5. Prior to that tile has been laid to the ceiling. And the walls are lined also not up to the end. And all this is not to shoot down the sake of saving time and money, I decided dorovnyat wall. Set beacons



6. As long as beacons dry, begin to lay new wiring



7.



8. Lighthouses dry. Levels.



9. A little bit of abstract art ...



10. Check



11. Hello neighbors



12. He closed the hole that was left of the old ventilation



13. To hide the ventilation, decided to make plasterboard. Naturally moisture resistant.



14.



15. Waterproof - that is the zelёnenky



16. Next, the pipe was replaced. I thought to do of metal, but seeing how much one's fitting * Itinga decided it's better to rent a soldering iron for polypropylene pipes. Pleasure is worth 300 rubles per day.



17.



18. All of this walled



19. Under the supervision of



20. Beautifully lie ...



21. We derive a water outlet for washing machine



22. She



23. Begin the installation screen



24. Well, where do without a cat?



25. Samoreziki ...



26. A process is coming!



27. Cut ...



28. ... fasten.



29. ... even fasten



30. Revision of the window. In the case of "Suddenly CHO!»

As observed native tile.



31. Begin to lay floor tiles. Well, you already know, without him, well, did not work))



32. Côte fed and sent about his business, you have to sleep. And I continue.



33. The first 11
pashol !!
(Tile has never himself did not fit)



34. Pyaty tiles - normal flight!



35.

In the process I realized that the teeth of 7 * 7 have too small spatula. It should be plenty. Taken into account for the future



36. Gender ready



37. Turning to the walls



38.



39.



40. His you know



41. And here is a little snag ...



42. But it is not a problem. The store bought Ballerina.



43. Ballet "Swan Lake»



44. And what happens

Yes, the other tiles. Installation error, so to speak.



45. We place to place.



46. ​​



47. The turn came spotlights



48.



49.



50. As all sink.



51. We hang locker. Truncated by the level!



52. Drill two holes, a special drill for tile.



53. insert the dowel-nail.



54. Sam locker. With a mirror!



55. Test the strength



56. The bath is changed to the new expensive. Fumbling in the internet to know about such a thing as "liquid acrylic." Calling wizards costs about 3-4 thousand. But we are not the hands of assholes as they say. I buy this acrylic these same masters and do everything myself. Savings of about 2 million.



57. Beauty!



58. On that day, when he wanted to put the washing machine, it became clear that the old inoperative. Out of order is pumped pump. It was decided to buy a new one.

12 years old worked



59. And that's what happened



60.



61.



62. Well, that's actually on the bathroom and everything. Weeks 3-4 will be ready WC, respectively, and will also be a report.

Thank you!

And now I am waiting for questions.