594
NSK "Olympic": One year later
Blogger tov-tob writes in his blog:
A year ago we first visited dfaw reconstruction "Olympic". There were no columns over the stands, no media complex (aka VIP-zone), or many other things. Over the past year there was a lot of changes: large and small, and not very noticeable. Today, you can clearly see the progress in the reconstruction of the past year, and look at the changes in the last month or two. For greater clarity, some photos were made with the same points, a year ago. I wanted to do more than "a few", but many on-site survey points are already the fresh design of the stadium
35 photos
1. Of course, the most notable change for the year - a metal awning installed and rebuilt from scratch VIP-zone. A year ago,
2. Who
3. Map of the stadium a year ago
4. Now.
5. The following two photos to make impossible. On-site design point shooting is now VIP-zone.
6.
7. VIP-zone is not only rebuilt, but already and partially glazed.
8. From the stadium bowl glazing has been completed.
9. But from the outside is still ongoing
10. Inside the VIP-zone of active communication and is mounted finish. In many areas, by the way, there are heaters and warm enough inside
11. Safety first
12. Over "Italian yard" are arch glazing works
13.
14.
15.
16. Bowl Stadium a year ago
17. Now
18. Around the eastern and southern part of the stadium is completed construction of a bypass flyover which will serve as an additional tool for the distribution of flows of people
19. South-eastern part of the complex a year ago. To the right is still unfinished flyover roundabout and on the left only built podzemenoe ring technical facilities
20. Who. Overpass is almost ready, the ring. premises to finish on top of him mounted column, and then close to the stands built another rack, which completely encircles the stadium and the fans used to pass to the upper tier of the stands
21. All the same, only in a different direction. On the hills around the stadium even begun to lay grass
22. In the bypass flyover recently started fencing
23. And the entire length of a long time already laid tile
24. Under the ring for the passage of the upper tier is laying granite
25. Upstairs
26. In the north-western part of the stadium last year was total devastation
27. Now there is a commercial area. Already completed work on the glazing started around landscaping.
28. Inside
29. Laying of granite slabs on the stairs
30.
31. In the south-western part of the stadium, where is located one of the parts of the parking lot, only a year ago dug pit. Now here the premises of the complex, and under the feet of already completed construction of parking
32. Before admin. housing in October just started construction of one of the parking
33. Now here is placed on the waterproofing overlap '
34. Yes, did question regarding the glazing of the facade of the stadium. Here is a partial sample
35. Instead of an epilogue
Source:
A year ago we first visited dfaw reconstruction "Olympic". There were no columns over the stands, no media complex (aka VIP-zone), or many other things. Over the past year there was a lot of changes: large and small, and not very noticeable. Today, you can clearly see the progress in the reconstruction of the past year, and look at the changes in the last month or two. For greater clarity, some photos were made with the same points, a year ago. I wanted to do more than "a few", but many on-site survey points are already the fresh design of the stadium
35 photos
1. Of course, the most notable change for the year - a metal awning installed and rebuilt from scratch VIP-zone. A year ago,
2. Who
3. Map of the stadium a year ago
4. Now.
5. The following two photos to make impossible. On-site design point shooting is now VIP-zone.
6.
7. VIP-zone is not only rebuilt, but already and partially glazed.
8. From the stadium bowl glazing has been completed.
9. But from the outside is still ongoing
10. Inside the VIP-zone of active communication and is mounted finish. In many areas, by the way, there are heaters and warm enough inside
11. Safety first
12. Over "Italian yard" are arch glazing works
13.
14.
15.
16. Bowl Stadium a year ago
17. Now
18. Around the eastern and southern part of the stadium is completed construction of a bypass flyover which will serve as an additional tool for the distribution of flows of people
19. South-eastern part of the complex a year ago. To the right is still unfinished flyover roundabout and on the left only built podzemenoe ring technical facilities
20. Who. Overpass is almost ready, the ring. premises to finish on top of him mounted column, and then close to the stands built another rack, which completely encircles the stadium and the fans used to pass to the upper tier of the stands
21. All the same, only in a different direction. On the hills around the stadium even begun to lay grass
22. In the bypass flyover recently started fencing
23. And the entire length of a long time already laid tile
24. Under the ring for the passage of the upper tier is laying granite
25. Upstairs
26. In the north-western part of the stadium last year was total devastation
27. Now there is a commercial area. Already completed work on the glazing started around landscaping.
28. Inside
29. Laying of granite slabs on the stairs
30.
31. In the south-western part of the stadium, where is located one of the parts of the parking lot, only a year ago dug pit. Now here the premises of the complex, and under the feet of already completed construction of parking
32. Before admin. housing in October just started construction of one of the parking
33. Now here is placed on the waterproofing overlap '
34. Yes, did question regarding the glazing of the facade of the stadium. Here is a partial sample
35. Instead of an epilogue
Source: