I washed down theater.





Given the popularity of the gash about anything and everything, I decided to share my skills and abilities.
As usual:
First post.
Please do not kick.
Will 26 ph. (sorry for the quality, because in addition to a jigsaw with integrated lighting, anything at hand was not)
Some photos, previously published on the website of my employer, so it is specified as the source tyts

I washed down theater.



We went to the room of the attic floor, which originally was planned to be used as a billiard room. That means no wires to the acoustics, or under the projector is not laid, ready to repair.
Gypsum damn ceiling does not allow to fasten the screen to the ceiling, and the distance between columns, so small that if you enter the screen there is the very meaning of the installation of the projector is reduced to zero.
The challenge is to find a place to install the screen with a width of not less than 240cm, set the speakers, set the projector, and to bring the hidden wire to make this work. To heap all this should be done with minimal damage and the consequences for the final finish.

I washed down theater.

photo3

I washed down theater.

photo4

I washed down theater.

photo5

I washed down theater.

Suffered, we build the basic framework.

I washed down theater.

Right now, time is still a fuss, we decided to use the embedded speakers.

I washed down theater.

Utrekalis customized corners, every one is different.

I washed down theater.

Then came a box hidden under the setting screen, along with the wires in the ceiling, brought to the projector through.

I washed down theater.

That sub found its place, setting the acoustics do not forget otshumit box inside and strengthen his ribs.

I washed down theater.

General view of the construction

I washed down theater.

Crashed into the central channel of the screen box.
Well, the trial run of the screen.

I washed down theater.

Admiring what happened and sticking facades.

I washed down theater.

Another general view, there are already at the rear of the column could be seen.

I washed down theater.

Here's a closer look and the rear of the column after painting.

I washed down theater.

Even the rear

I washed down theater.

And here in front painted.

I washed down theater.

Another front view.

I washed down theater.

And the other side of the rear acoustics

I washed down theater.

We produce fabric grill. And also paint the shelves.

I washed down theater.

Another view.

I washed down theater.

That rears ready

I washed down theater.

Well, the result itself

I washed down theater.

More

I washed down theater.

More

I washed down theater.

and

Posted in [mergetime] 1378109420 [/ mergetime]
All I finished.
Costs of material 70 TR
And three weeks time.

I washed down theater.

Source: ">