559
A four-hour walk along the Dnieper in Kiev reservoir
Letters found on small, perhaps due to the fact that after all the strategically important object of information in the internet and a cat laugh. So, not for the first time riding, but this time was potrezvee and decided to make a photo report
A four-hour walk along the Dnieper in Kiev reservoir (which we like to call the Kiev Sea).
01. Coming to the gateway. The water level in the river is lower than in the reservoir
02. "transition" road only green)
03. Entrance gate
04.
05.
06. through the gate will run the water when the input closes
07. Hook-float mooring. There are several on each side of the gateway to a few vessels
08. Atraktsion "Dialled lasso»
09.
10. The entrance gate closes
11. They locked
12. A concrete wall near the gateway
13. Begin to run water from the reservoir
14. Drives strong foam
15. And wave. Teplohodik great shakes. If no mooring - would bear around the gateway
16. The water level between the reservoir and the gateway to equalize, you can open the gate. They descend
17. The way is clear, you can swim out to the mooring and the big water
18. Parasites. They were there during the sluicing weight - probably waiting stunned pressurized water fish)
19. It was possible to make the frame of the Kiev HPP
20. A small circle on the reservoir and back to the gateway. I want to draw your attention to the difference in water levels.
21.
22.
23. We are at the bottom of the gateway. Foam on the gate of the previous entry
24. Opening
25. Hydraulics, which opens the gates
26. A little more))
27. All clear
28. "Crossing the road" only green))
29. departures ...
30. This is the last, sorry, I threw a few due to the almost identical, that you are not downloading.
Nicely we ...
Source:
A four-hour walk along the Dnieper in Kiev reservoir (which we like to call the Kiev Sea).
01. Coming to the gateway. The water level in the river is lower than in the reservoir
02. "transition" road only green)
03. Entrance gate
04.
05.
06. through the gate will run the water when the input closes
07. Hook-float mooring. There are several on each side of the gateway to a few vessels
08. Atraktsion "Dialled lasso»
09.
10. The entrance gate closes
11. They locked
12. A concrete wall near the gateway
13. Begin to run water from the reservoir
14. Drives strong foam
15. And wave. Teplohodik great shakes. If no mooring - would bear around the gateway
16. The water level between the reservoir and the gateway to equalize, you can open the gate. They descend
17. The way is clear, you can swim out to the mooring and the big water
18. Parasites. They were there during the sluicing weight - probably waiting stunned pressurized water fish)
19. It was possible to make the frame of the Kiev HPP
20. A small circle on the reservoir and back to the gateway. I want to draw your attention to the difference in water levels.
21.
22.
23. We are at the bottom of the gateway. Foam on the gate of the previous entry
24. Opening
25. Hydraulics, which opens the gates
26. A little more))
27. All clear
28. "Crossing the road" only green))
29. departures ...
30. This is the last, sorry, I threw a few due to the almost identical, that you are not downloading.
Nicely we ...
Source: