Before and after the Kazan 2013 Universiade

the very Universiade, including the restoration and re-built 64 sports facilities, spent 40 billion rubles. And the rest of the money - in fact, to bring the city in order. Build the road (150 km), isolation (11 pieces), pedestrian crossings (28), the metro station, the railway from the airport to the city center, half a dozen multi-level parking lots, residential campus of 20 buildings, which later will be the campus for two high schools of the city, etc. Impressive action "green record". By November 2012 a half months have been planted 44,000 trees and 20,000 shrubs.

The long-suffering house Fuchs on the streets of Moscow (Kirov) in 2012




He also in 2013











Universiade on the right bank of the Kazanka was built family center. April 2013



June 2013



And I look around the center of the area in April 2013.



and so in June



Reconstruction of Lenin dam. June 2013



July 2013



And here is how the construction of the transport interchange was held on Lenin dam Old Bridge in 2011



The destruction of the bridge in 2012



April 2013



June 2013



As for the Universiade to build the Palace of water sports. Winter 2012



April 2013



June 2013



Kazan Stadium - Arena, also built for the Universiade. There was a ceremonial opening of the games. Winter 2012



April 2013



June 2013



Stalls Hay market in the streets of Moscow, as they appear in April 2013.



And so in June.



Fire tower of the 19th century on the same street in April 2013.



June 2013



Hotel "Kazan" on the street Bauman was almost destroyed, so it looked in 2012. And the second frame are made in June 2013





Source: vvv-ig.livejournal.com