As Moscow YaPtusa glass me.

It just so happened that the finale of one of the gatherings at the cafe was broken glass. Let's leave behind the scenes the process of swelling and breakage. The bottom line to obtain the following: left (see photo) glazed (double chamber, that consists of three glasses) had broken inside the glass (it toned film, because there on the spot and gave a little fragments.

17 photos





Actually kind of a package inside. The photo has dismantled finish, but other photos do not have, sorry.



More close-up. A square piece of dubbing films cut to the sample.



2 offices, which causes the director of the institution (adequate and very nice person!) Is the sum of 30 and 50 thousand. Rubles. But for measurements of glass they needed to dismantle it. Ie first (in theory) they were going to remove the package and then make a new one (called a period of about a week), then install. Outside it was cold in March ...
As a result, we decided to replace an independent package. To assess the scale of the disaster had to turn to the director of the company in the design of facades, part-time my friend and a good person. That is at the stage of measuring and loomed whole fucking tragic situation.
The fact that this hut built some Krivorukov Tajiks with terrifying the Budget. If in the normal case is glazed in a frame made of PVC or aluminum profile, everything is done much cheaper. New windows simply inserted from the outside into the iron frame of the building, recorded that came to hand, and all that is imposed from the outside tiles. Schematically sketched the picture cut in the horizontal plane.



Disassemble the tiles outside it was not in our plans (and where then to take the same?), So the only remaining way to - package insert inside. If the top and bottom of this invention there is almost no interference, then the sides of the glass is prevented from failing into the room corners marked on the chart. According to the project the right corner had to cut / tear / cut of the shelf, left left untouched. The new package was ordered a few too old to make it for the left corner. By the way, there were difficulties with the thickness of the package (it calculates almost empirically), because here, too, err, making new known already. 24 mm to 32 mm stranded on the broken. It is essential to reduce the thickness allowed is that we do not have three-chambered package, but used twice as thick glass (two 6 mm against former three 3 mm). As a result, virtually no heat loss suffered (she was suffering around the window is much stronger because of krivorukost builders), but the strength increased. Well, dubbing the film is now within, not outside, so it can not be scratched.
Well Well, the package is made. He walked in a little more than 6 thousand rubles, and more than one third in the price - the price of tinting. But there was a large delivery joint, so I decided to do it yourself. Do not ever do! 70 km from the size of a piece of glass 1.5h1.7 m and weighing hundreds of kilograms under the roof of the spring bombed roads - it will tell you, not weak emotion.



Since the cafe is open from 15-00, then it decided to change the window Monday morning, so as not to disturb the operation of the facility. The work was carried out by three YaPovtsev abizyan and two Uzbeks.
Inner sill trim and corner racks removed. We propose to remove the right area and get completely smashed package.



However, we do not see what's inside corner too rare tack welded, and even through it screwed screws (see. Diagram). Therefore cut welding.



In some places the quality is such that at a minimum the cut all the flies itself. Since the entire building is built.



However, all attempts to get the Area are futile.



Lightly failed. Then, beat the old package and pulled to pieces. The good news is that the extra work done are not a lot of - Area, which promuchalis, still planned to remove. We start with the inner (broken) glass. It is, remember, plastered dubbing the film, because does not break into pieces. Horizon Video is constantly spinning, but then all the questions to the operator :)

And finally, go to the main stage of the dismantling of the package by breaking:

The plan was first to break one outer glass, but it turned out how it happened :)
Processes debris removal and insertion of the new package were not sealed, because in the first there was absolutely nothing interesting, and the second was attended by all the role of the operator to perform there was no one. It would seem, at least a hundred kilograms hold at least 3 people (suckers were no more the fault of abizyan), but it was very hard! As a result, "using scrap and someone's mother» © Anek, we stuck the new package to its rightful place. We fix its old shtapikami top and bottom:



Check status:



Propenivaem the perimeter:



Working conditions:



Then going back furnish, install window sills (outside we destroyed in the process of breaking down the glass, so it is new, but for the oppression it is my jack). Where necessary, we use silicone sealant.



We hang back tryahomudiyu all types of garlands and curtains.



And consider the work performed. Excess foam and sealant will be trimmed later, after drying.



Happy face otmuchilsya person :)
That's all!



Source:

Tags

See also

New and interesting