553
Kiev funicular
One of the attractions. Of course, now is not so relevant means of transportation, but nevertheless.
Works on the "arrangement of an electric cable railway" (Mikhailovsky mechanical lift, or Mikhailovsky electric cable climb, so named for the nearby Mikhailovsky Golden-Top Monastery), which would connect Mikhailovsky Hill with Borichev current, were made from 1903 and ended in the spring of 1905.
Elevation difference between stations: 75 m
Length of trails: 222 m.
Slop: 18-20°
Capacity of the car: 100 people.
Seats: 30.
2.
3.
40062.
4.
5.
6.
7.
Works on the "arrangement of an electric cable railway" (Mikhailovsky mechanical lift, or Mikhailovsky electric cable climb, so named for the nearby Mikhailovsky Golden-Top Monastery), which would connect Mikhailovsky Hill with Borichev current, were made from 1903 and ended in the spring of 1905.
Elevation difference between stations: 75 m
Length of trails: 222 m.
Slop: 18-20°
Capacity of the car: 100 people.
Seats: 30.
2.
3.
40062.
4.
5.
6.
7.