Mainskaya HPP trout farm and Yenisei





Mainskaya HPP - the younger sister of the power plant, which is 21 kilometers downstream of the Yenisei. Both stations are a single hydroelectric complex, technologically closely related: Mainskaya - kontrreguliruyuschaya station Sayano-Shushenskaya - peak. On the technical level, this complex is unique in Russia.
31 photos via Dmitry Chistoprudov

1. In the course of the year, and during the day electricity needs are different, so the peak hydroelectric SSHHPP (pictured) promptly reacts to these fluctuations. This leads to a permanent change in the level of the river downstream and causes inconvenience to the water user communities located downstream of the Yenisei.

Mainskaya HPP trout farm and Yenisei



2. In order to solve this problem was built Mainskaya HPP. Its main task (except for power generation) - smooth out the fluctuations in the level of the river after the Sayano-Shushenskaya HPP. Compared with the older CETP Mainskaya station it seems baby.

Mainskaya HPP trout farm and Yenisei

3. The height of the spillway of the dam of 34 meters.

Mainskaya HPP trout farm and Yenisei

4. The total length of the ridge about 750 meters, and in contrast to the Sayano-Shushenskaya HPP, the dam station organized a free car passage across the Yenisei.

Mainskaya HPP trout farm and Yenisei

5. You can rotate the arm back and forth.

Mainskaya HPP trout farm and Yenisei

6. The engine powerhouse has 3 Kaplan hydro unit capacity of 107 MW.

Mainskaya HPP trout farm and Yenisei

7. Appearance hydrounits resembles cosmic booths rides from my childhood.

Mainskaya HPP trout farm and Yenisei

8.

Mainskaya HPP trout farm and Yenisei

9.

Mainskaya HPP trout farm and Yenisei

10. Water turbines HPP was unsuccessful designed and could not work in Kaplan mode, resulting blades were zafiksirovanny at a certain angle, which greatly reduced the efficiency of hydroelectric power plants.

Mainskaya HPP trout farm and Yenisei

11. In 2006, one of the impeller hydraulic units were replaced, thus increasing plant production. It is planned to replace impellers remaining hydraulic units, and construction of another power house with two hydraulic units, which will significantly increase the capacity of the plant.

Mainskaya HPP trout farm and Yenisei

12.

Mainskaya HPP trout farm and Yenisei

13. The central control HPP.

Mainskaya HPP trout farm and Yenisei

14. bubbling water after passing through the station.

Mainskaya HPP trout farm and Yenisei

15.

Mainskaya HPP trout farm and Yenisei

16. Gantry Crane to open the gates.

Mainskaya HPP trout farm and Yenisei

17 Pressure hydropower facilities form Mainskoye reservoir length of 21, 5 km and a width of 500 m and a depth of 13 m.

Mainskaya HPP trout farm and Yenisei

18 fishermen.

Mainskaya HPP trout farm and Yenisei

19. Here is the trout farm. After the accident at the Sayano-Shushenskaya HPP killed a lot of fish because of the saturation of water with oxygen.

Mainskaya HPP trout farm and Yenisei

20

Mainskaya HPP trout farm and Yenisei

21

Mainskaya HPP trout farm and Yenisei

22

Mainskaya HPP trout farm and Yenisei

23. You can buy fresh fish for 600 rubles per kilogram.

Mainskaya HPP trout farm and Yenisei

24

Mainskaya HPP trout farm and Yenisei

25

Mainskaya HPP trout farm and Yenisei

26 And a few photos of the Yenisei River and its shores.

Mainskaya HPP trout farm and Yenisei

27

Mainskaya HPP trout farm and Yenisei

28

Mainskaya HPP trout farm and Yenisei

29

Mainskaya HPP trout farm and Yenisei

30

Mainskaya HPP trout farm and Yenisei

31

Mainskaya HPP trout farm and Yenisei

Source: ">