Like the first time I was putting a lot of cable





A couple of years ago, the company that administers, expanded and moved to a new, more extensive room. The landlord has handed us a bare area in which the builders to build the walls, electrical wiring pulled, well, I, first for himself, traveled as a fitter SCS. This post is a photo report can somebody be interesting to see, and people who have installation work - bread, will give out some comments and derision for the curvature of the work. I ask a cat (careful, a lot of photos).

Like the first time I was putting a lot of cable



Summary of the cabinet to the magic room (server) was stretched 4, 5km wires. There were about 70 cables for internet, telephony by ~ 60 ~ 50 and 16 under the CDS analog video surveillance. The work is done alone, except for a couple of days he took an assistant to lay cable in the tray and hold on to all the wealth of the server.

Once everything was in my "office", this orgy looked like this:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

First of all, engaged in sorting out the cable for its intended purpose. We start with the phone:

Like the first time I was putting a lot of cable

Next, begin to unravel the network cable:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

After proceed to the easiest, video:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

And it remains the case for small cable ACS:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

General view of the collage:

Like the first time I was putting a lot of cable

Few are sorted out and the exit from the tray:

Like the first time I was putting a lot of cable

Next we need a wire tray for laying into him (or it) cable:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

With a wire tray left a small incident.

In the store where the assembly was bought things to the tray was not fixing rather was the only fixture in the catalog with an unclear picture, the manager himself could not understand that this is nonsense. In the end, it turned out that the ceiling mount hardware, and I need something for the wall. Well, there was nothing, came out of the situation because - went to the construction market, acquired a metal strip with a thickness of 5 mm, a Batey in the garage drilled holes along the edges of the bolt, bent strip in a vise, turned figure in the form of P acquired bolts + large washers and there you are:

Like the first time I was putting a lot of cable

Below the floor just for the ceiling mount, even for something amiss:

Like the first time I was putting a lot of cable

Then I begin to lay cable. First, the gasket in the farthest corner - cable under the CDS:

Like the first time I was putting a lot of cable

Then, under surveillance:

Like the first time I was putting a lot of cable

I looked at this thing, not like me, I decided to remake:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

Further, the cable laid ostvshiysya:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

After the tedious work with a wire tray, proceed to the drudgery of a switching bar. In it, I started cable telephony and network and started to embroider patch panel under the Network:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

Once engaged ATS Coy:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

Rang embroidered rosettes, undertake the ACS:

Like the first time I was putting a lot of cable

Pay-Per-stage connection:

Like the first time I was putting a lot of cable

Thus here is located on the wall bespereboynik:

Like the first time I was putting a lot of cable

Usually kontsetratory doors and UPS hang directly above the cabinet doors, but the office design intent was that hang them over the door was unreal. All ACS decided to place in the corner, with the time it was very comfortable and did not regret that chose this approach to implementation.
End the connection boards and run. Diodes lit, all launched successfully:

Like the first time I was putting a lot of cable

Well, under the end- control cabinet assembly:

Like the first time I was putting a lot of cable

...

Like the first time I was putting a lot of cable

And the overall picture:

Like the first time I was putting a lot of cable

In conclusion, the work was about 3 months. Everything is done for the first time and the experience was only 2 months of work by the installer of the local area network, so five years ago. Somewhere might have done something wrong, somewhere not on the standards (if so, specify pliz knowledge all are the force), cabling, and the structure itself was taken from the head, in the hope that it will be convenient to work in future. More pictures can be found here.
Thank you.