Excursion to Vyksa Steel Works





Back in the Soviet era, it has become the largest manufacturer VMZ electric-welded pipes and railway wheels. In one post can not embrace all the production facilities of the company. I'll show you the ISS-500 (no, this is not the international space station) and complex electric-welded pipe of large diameter pipes, which are issued single-seam welded pipes for main oil and gas pipelines with a diameter up to 1420 mm and wall thickness up to 48 mm.
Slyabohranilische. Here begins the MCS-500. ISS - metallurgical complex mill-5000. The construction of the complex took four years - from May 2007 to October 2011. (commissioned November 25, 2011). Products MKS-5000 - a thick sheet of high-strength steel for the manufacture of large diameter pipes. The design capacity of the complex is 1, 5 million. Tonnes of sheet (rental) per year.

Excursion to Vyksa Steel Works



The slabs are sent to the gas stove.

Excursion to Vyksa Steel Works

There slab during 4-5 hours heated at a temperature of from 900 to 1300 degrees. Control of temperature of metal in the furnace is Dualsens temperature units.

Excursion to Vyksa Steel Works

Harvesting warmed up and ready for execution at the mill.

Excursion to Vyksa Steel Works

Such is the red brick enters the rolls.

Excursion to Vyksa Steel Works

In the photo is visible on the time of descaling hot rolling mill - scale removal from the metal surface with water under high pressure.

Excursion to Vyksa Steel Works

Our slab already half unrolled.

Excursion to Vyksa Steel Works

As a pancake in a frying pan.

Excursion to Vyksa Steel Works

The drive system of the rollers of the motor. The incredible beauty of the movement.

Excursion to Vyksa Steel Works

Each roller mill to move the sheet has an individual drive.

Excursion to Vyksa Steel Works

The water supply system for the installation of cooling sheets.

Excursion to Vyksa Steel Works

Megaprivod clips! Everything works from a single motor and a tricky junction box!

Excursion to Vyksa Steel Works

Water on plant circulates in a closed circuit.

Excursion to Vyksa Steel Works

Cooling of rolled sheet.

Excursion to Vyksa Steel Works

Deep - slow cooling section sheets, which lasts at least 48 hours!

Excursion to Vyksa Steel Works

And right there is a refrigerator. It is written on the label.

Excursion to Vyksa Steel Works

It rolled sheets are cooled and fall into a cold straightening machine.

Excursion to Vyksa Steel Works

Visual inspection is almost finished sheet.

Excursion to Vyksa Steel Works

Tilter for turning sheet. It is necessary because it is necessary to examine both the surface.

Excursion to Vyksa Steel Works

Scissors for trimming. Can cut metal thickness up to 48 mm. Basically, fat
a sheet of high strength steel is ready. Then he moved to the workshop, which produces pipe.

Excursion to Vyksa Steel Works

From a warehouse in the right sheet output tray served.

Excursion to Vyksa Steel Works

Very nice magnetic grip.

Excursion to Vyksa Steel Works

In the corners of the sheet strips welded technology - they are used to ensure the quality of the weld seam of the pipe. The fact is that at the beginning and end of the seam welding process does not meet the required parameters. And not to cut the piece of pipe came up with a solution.

Excursion to Vyksa Steel Works

Sheets with welded bars on the conveyor technology comes at a press hem edges.

Excursion to Vyksa Steel Works

Press hem edges. Here, the sheet is prepared for processing in stepwise molding press.

Excursion to Vyksa Steel Works

The next step - stepwise molding press.

Excursion to Vyksa Steel Works

Presses 6000 tonnes oppression sheet into a tube.

Excursion to Vyksa Steel Works

A few minutes - and prefabricated pipe ready.

Excursion to Vyksa Steel Works

Already familiar technology for welding strips. Note: the pipe is far from a perfect circle.

Excursion to Vyksa Steel Works

Visual inspection of the inner surface.

Excursion to Vyksa Steel Works

In the first phase welding is done inseam that just pierces the edge of the pipe.

Excursion to Vyksa Steel Works

Trims boil manually.

Excursion to Vyksa Steel Works

Generally pipe shop is huge. Around there are different lines for the production of all kinds of pipes, differing from each other in diameter and purpose. Alas, one does not show the entire reportage.

Excursion to Vyksa Steel Works

The main welding seam. First, the electrodes are exposed.

Excursion to Vyksa Steel Works

The tube is then pushed back a little back to the start of the process was at the bar.

Excursion to Vyksa Steel Works

Welding seam!

Excursion to Vyksa Steel Works

Flux is suctioned to clean and reuse.

Excursion to Vyksa Steel Works

Ready seam.

Excursion to Vyksa Steel Works

All pipe is ready. At the same time there is a number of welding pipes.

Excursion to Vyksa Steel Works

At each stage, in addition to the visual and automated control is present. In the photo, for example, the installation of inspection for each seam of each tube!

Excursion to Vyksa Steel Works

This pulls the tube from the conveyor for a detailed study. It will cut into pieces, check seam section, will take samples of metal and probed every part!

Excursion to Vyksa Steel Works

Russian size! Just that same 1,420-mm pipes with a wall thickness of 48 mm.

Excursion to Vyksa Steel Works

Behind the scenes remained the installation of expansion, which decompresses the pipe from the inside, giving it the shape of a perfect circle. Next, the pipe cover internal and external anti-corrosion coating and sent to the warehouse where and shipped to customers.

Excursion to Vyksa Steel Works

April 15 at the factory produced the first pipe to the underwater section of the "South Stream"! Total company will supply for this project 600 kilometers of pipes. The depth of the stream more than two kilometers, so the pipeline increased requirements. Specifically, the roundness can be up to four millimeters. This value is less than twice the standard. VSW is able to release an hour about 135 tons of such pipes (the weight of one - 9 tons.

Excursion to Vyksa Steel Works

And some photos from the company, which looks like a city.

Excursion to Vyksa Steel Works

A beautiful bucket of steel mill division of railway wheels.

Excursion to Vyksa Steel Works

One of the stages of the process for the production of railway wheels. Cool the mold, which is filled with steel ingots, from which subsequently make wheels. Of this production must, of course, prepare a separate report.

Excursion to Vyksa Steel Works

Just a beautiful view of the railway track. By the way, their total length at VSW - 157 kilometers.

Excursion to Vyksa Steel Works

. Really like this shot ...

Excursion to Vyksa Steel Works

Source: russos.livejournal.com