Work Gateway





The story about the Volga Hydroelectric Power Station will start with the ship lock.
Volzhskaya HPP is srednenapornoy hydroelectric channel type. The structure of the main waterworks are: powerhouse, concrete spillway and earth dams, shipping facilities.
Shipping constructions (locks, boat lifts, etc.) - Are designed for lifting or lowering ships from one water level to another.
As part of the waterworks two lock chambers, at numbers 30 and 31.
Work Gateway



2. The cargo ship enters the approach channel.

Work Gateway

3. Ship with tourists in one of the chambers of a lock.

Work Gateway

4. The cargo ship "Sormovo 3064" enters the airlock.

Work Gateway

5. On a command from the control it is pressed against one of the sides of the sluice chamber.

Work Gateway

6. The valves are closed chamber under the supervision of an employee.

Work Gateway

7. Employee Gateway looks to during the closing between the valves no foreign objects.

Work Gateway

8. Folds airlock closed. The lock chamber starts to enter the water.

Work Gateway

9. After a few minutes airlock filled with water.

Work Gateway

10. The excess water flows into the spillway.

Work Gateway

11. The cargo ship mooring team.

Work Gateway

12. The view from the control tower to the upper chambers of a lock.

Work Gateway

13. The lower chamber gateways.

Work Gateway

14. Passenger ship "K.Minin" exits from the top of the lock chamber.

Work Gateway

15. View of the drainage channel of the lower lock chambers.

Work Gateway

16. The building mezhshlyuzovoy HPP, which is structurally part of waterworks, but is not legally relevant to the Volga hydroelectric station, has two Kaplan hydroelectric PL30-B-330.

Work Gateway

17. Gateway Gateway, a total weight of 390 tons.
For half a century here was carried almost 423,000 sluicing through the main gate of the sash passed 950,000 vessels. The total volume of freight traffic has exceeded 802 million tons.

Work Gateway

Source: dervishv.livejournal.com