522
Kitchen, we changed the kitchen
53 photos will be if it will be interesting to tell the cost.
The period of 12 days from and to.
second
third
fourth
chief engineer of this construction)
sixth
sedyamaya
eight
nine
Ten
Eleven
12
13
14
15
16
17
18 along with the battery box and washed pokraslili
19
20. Yayayayayaya
21
22 joined by another party building
23
24
25
26 begin to collect
27
28 assembly process
29
30
31)
32
33
34
35
36
37
38
39
Posted in [mergetime] 1405344769 [/ mergetime]
I have everything! kick the can, which is part of the gallery disappeared, is a seating area with beds, no tables and doors, a table will be today tomorrow, but about the door I think, can put the arch.
kitchen area 8.5 meters.
Thank you all)
The period of 12 days from and to.
second
third
fourth
chief engineer of this construction)
sixth
sedyamaya
eight
nine
Ten
Eleven
12
13
14
15
16
17
18 along with the battery box and washed pokraslili
19
20. Yayayayayaya
21
22 joined by another party building
23
24
25
26 begin to collect
27
28 assembly process
29
30
31)
32
33
34
35
36
37
38
39
Posted in [mergetime] 1405344769 [/ mergetime]
I have everything! kick the can, which is part of the gallery disappeared, is a seating area with beds, no tables and doors, a table will be today tomorrow, but about the door I think, can put the arch.
kitchen area 8.5 meters.
Thank you all)