195
Repair of children's
Once I went to a tendency to spread its repair square meters, it'll put in my two cents.
PS is not part of the picture for various reasons (no time to take pictures or camera was not on hand)
The initial state of the 01 rooms has been preserved.
The first is that we do not need is a storage room. Take the hammer and pass the fuck it.
02
03
04
Little tidy. We remove the garbage. And that move is awkward.
In the corner, too, pantry, the only entrance from the other room. She also broke, but no photos.
05
All unnecessary walls broken. Wall stopper. On the floor laid fiberboard.
06
Another view. Linoleum is tracked just
07
08
Foreman
09
Wallpapers
10
Horizon littered
11
12
Rest
13
Long chose the color of the walls. There were options for a light peach or pale pistachio. We stopped at the peach. While the paint dries it looks horrible
14
Painting like dry. I found a nasty jamb to the floor in a place where there was a "second" closet. I had to open.
15
16
Ceilings in the meantime been pulled
17
Switches, sockets. The transfer process has not been preserved
18
Linoleum. Skirting.
19
The same cornice +
20
Testing coverage
21
22
Options for lighting lamps.
Lamps
Backlit pink
Backlit red
Backlit blue
Iridescent lights.
All right.
Also in the room is 6 spots
23
We put the door
24
The windows were set in advance. Just beforehand we were made slopes. It remains only to cut plastic ukolki
25
Collected table for children
26
Last. We can only bring furniture.
Source:
PS is not part of the picture for various reasons (no time to take pictures or camera was not on hand)
The initial state of the 01 rooms has been preserved.
The first is that we do not need is a storage room. Take the hammer and pass the fuck it.
02
03
04
Little tidy. We remove the garbage. And that move is awkward.
In the corner, too, pantry, the only entrance from the other room. She also broke, but no photos.
05
All unnecessary walls broken. Wall stopper. On the floor laid fiberboard.
06
Another view. Linoleum is tracked just
07
08
Foreman
09
Wallpapers
10
Horizon littered
11
12
Rest
13
Long chose the color of the walls. There were options for a light peach or pale pistachio. We stopped at the peach. While the paint dries it looks horrible
14
Painting like dry. I found a nasty jamb to the floor in a place where there was a "second" closet. I had to open.
15
16
Ceilings in the meantime been pulled
17
Switches, sockets. The transfer process has not been preserved
18
Linoleum. Skirting.
19
The same cornice +
20
Testing coverage
21
22
Options for lighting lamps.
Lamps
Backlit pink
Backlit red
Backlit blue
Iridescent lights.
All right.
Also in the room is 6 spots
23
We put the door
24
The windows were set in advance. Just beforehand we were made slopes. It remains only to cut plastic ukolki
25
Collected table for children
26
Last. We can only bring furniture.
Source: