1338
Repair 2-room Khrushchev
A bit of text.
The apartment was purchased two years ago with a facelift in addition to the bath, so when buying their square meters, it was no small matter when choosing an apartment. We stopped with their belongings and planned to live as five short years, and then begin to repair their own hands, after having accumulated funds and energy. But it was not there ...)))
Planning has already been pre-converted to us as the rooms were adjacent former owner shared a dressing room and did, which made it possible to exclude cases - coupe monsters)))).
Poraskinuv thoughts, it was decided from the tiny toilet and baths do something like normal wc)). But this choice has led to the loss of the corridor and all this led to the knocking out a wall between the lounge and kitchen))))) about this in the following sections ...
Part 1
So alteration bath and closet
Home)))
Horror
Remembering scary
Beams under the doorway
Already the former entrance to the kitchen which is well hidden under the tile door remained the same)))
Riser hot water played an important role in choosing the bath because it was pulling a large transfer gemorrrrrroy))) it was decided to put the bath on that later ...)))
Everyday work frame)))
FAS, no profile))))
Divorce water! top hot, cold below, pipes metaloplastik
Came sink try on and dream)))
And then - Profile
Slowly, confidently on
The process of plasterboard lining and the beginning of laying tiles was successfully lost in Egypt, together with the Samsung Galaxy 2)))))
So something like
Podium bath successfully closed risers hot water)))) bathroom were satisfied, because the whole bath Sanitary Ware turned around 4m kvadratnenkih
Posted in [mergetime] 1384089864 [/ mergetime]
Next
Next
But tub and faience come))) and a boiler in place suspended
The other side
Processability window
Boiler
Once more but at
We arrived the guys pulled the ceiling itself could not have done))) many corners
View from the front door
Posted in [mergetime] 1384090360 [/ mergetime]
Shelves, Mirror, and female happiness !!!
Helped renovated baths and tualetischa spouse, mate choice and a piece of drywall the hell it was all sealed !!!
Well, if more interesting-kitchen, hallway, bedroom ...
I dare all !!!
Source:
The apartment was purchased two years ago with a facelift in addition to the bath, so when buying their square meters, it was no small matter when choosing an apartment. We stopped with their belongings and planned to live as five short years, and then begin to repair their own hands, after having accumulated funds and energy. But it was not there ...)))
Planning has already been pre-converted to us as the rooms were adjacent former owner shared a dressing room and did, which made it possible to exclude cases - coupe monsters)))).
Poraskinuv thoughts, it was decided from the tiny toilet and baths do something like normal wc)). But this choice has led to the loss of the corridor and all this led to the knocking out a wall between the lounge and kitchen))))) about this in the following sections ...
Part 1
So alteration bath and closet
Home)))
Horror
Remembering scary
Beams under the doorway
Already the former entrance to the kitchen which is well hidden under the tile door remained the same)))
Riser hot water played an important role in choosing the bath because it was pulling a large transfer gemorrrrrroy))) it was decided to put the bath on that later ...)))
Everyday work frame)))
FAS, no profile))))
Divorce water! top hot, cold below, pipes metaloplastik
Came sink try on and dream)))
And then - Profile
Slowly, confidently on
The process of plasterboard lining and the beginning of laying tiles was successfully lost in Egypt, together with the Samsung Galaxy 2)))))
So something like
Podium bath successfully closed risers hot water)))) bathroom were satisfied, because the whole bath Sanitary Ware turned around 4m kvadratnenkih
Posted in [mergetime] 1384089864 [/ mergetime]
Next
Next
But tub and faience come))) and a boiler in place suspended
The other side
Processability window
Boiler
Once more but at
We arrived the guys pulled the ceiling itself could not have done))) many corners
View from the front door
Posted in [mergetime] 1384090360 [/ mergetime]
Shelves, Mirror, and female happiness !!!
Helped renovated baths and tualetischa spouse, mate choice and a piece of drywall the hell it was all sealed !!!
Well, if more interesting-kitchen, hallway, bedroom ...
I dare all !!!
Source: