As gash house with his own hands
Good evening to all readers. I wanted to share with Yapovtsami experience built his house is almost entirely his family home. I warn you once - removed the old screwdriver!
It made a lot Intersnyh such as:
-Manage heating based electronic unit for refrigeration equipment.
-teploizolyatsiya outlets (who built it knew of outlets always blowing)
-Set heating injector powered
-Climate control in the basement. The unit controls the heater and the hood to create a microclimate.
-razvedena Network for Computers and TV throughout the house.
-Installed timer lighting outside the house.
and much more. Ask questions about the self-line - be sure to answer!
Home Builders believe since the delivery timber - March 13, 2012,.
Bruce brought raw, heavy and it was very cold to unload it.
We put all rovnenko, covered and left to warm season.
Then came a warm April, the dog clearly fulfilled the task of preservation of timber of unknown individuals
We began to demolish everything that hindered development plan for the future of the house.
The first thing gash shed for storage (to and from the old house were many)
sheathed inside made shelf
then demolished garage, half of the old houses and households. the buildings.
everything was going to be demolished, as all this construction, the so-BC 50-60
Parse an old house and clear the area for construction.
Fill ... and the beginning of construction for long and costly should be!
Common efforts and financial support of the whole family in October was already covered frame.
Another couple of months and internal finishing works and something began to emerge.
We sheathe plasterboard and divorce electrician ...
Then came half alignment of the walls, laying tiles, construction of stairs, wallpapering, laying laminate and a lot more then, but in the end December 1, 2013 officially settled.
All of the ground floor has been laid radiant floor heating. Total length of over 300 meters of pipe. On the second floor of the battery installed.
Total took not much more than 1, 5 years to build a house from scratch. It spent a lot of free time, the same amount of money and nerves.
In this state, we are all now:
the first room - bedroom.
bathroom with very impractical (as it turned dark floors)
Through room (common room)
The second floor is not financially pulled, but the summer there are also all do ... accomplish your goal.
Well, the outside is almost done. (photo by something I can not find the last, here's to the glazed balcony)
The post would not be complete without the foreman, who had been watching the construction site.
Posted in [mergetime] 1390503642 [/ mergetime]
Lastly, to add Intersnyh installed mirrored window (because the house next to the road, and it would have been seen) and shtulpikovye (swing without walls) window.
ALL! Pina !!!
Source:
It made a lot Intersnyh such as:
-Manage heating based electronic unit for refrigeration equipment.
-teploizolyatsiya outlets (who built it knew of outlets always blowing)
-Set heating injector powered
-Climate control in the basement. The unit controls the heater and the hood to create a microclimate.
-razvedena Network for Computers and TV throughout the house.
-Installed timer lighting outside the house.
and much more. Ask questions about the self-line - be sure to answer!
Home Builders believe since the delivery timber - March 13, 2012,.
Bruce brought raw, heavy and it was very cold to unload it.
We put all rovnenko, covered and left to warm season.
Then came a warm April, the dog clearly fulfilled the task of preservation of timber of unknown individuals
We began to demolish everything that hindered development plan for the future of the house.
The first thing gash shed for storage (to and from the old house were many)
sheathed inside made shelf
then demolished garage, half of the old houses and households. the buildings.
everything was going to be demolished, as all this construction, the so-BC 50-60
Parse an old house and clear the area for construction.
Fill ... and the beginning of construction for long and costly should be!
Common efforts and financial support of the whole family in October was already covered frame.
Another couple of months and internal finishing works and something began to emerge.
We sheathe plasterboard and divorce electrician ...
Then came half alignment of the walls, laying tiles, construction of stairs, wallpapering, laying laminate and a lot more then, but in the end December 1, 2013 officially settled.
All of the ground floor has been laid radiant floor heating. Total length of over 300 meters of pipe. On the second floor of the battery installed.
Total took not much more than 1, 5 years to build a house from scratch. It spent a lot of free time, the same amount of money and nerves.
In this state, we are all now:
the first room - bedroom.
bathroom with very impractical (as it turned dark floors)
Through room (common room)
The second floor is not financially pulled, but the summer there are also all do ... accomplish your goal.
Well, the outside is almost done. (photo by something I can not find the last, here's to the glazed balcony)
The post would not be complete without the foreman, who had been watching the construction site.
Posted in [mergetime] 1390503642 [/ mergetime]
Lastly, to add Intersnyh installed mirrored window (because the house next to the road, and it would have been seen) and shtulpikovye (swing without walls) window.
ALL! Pina !!!