Walk on the unfinished hotel in St. Petersburg

"Northern Crown" began to build in 1988, the Yugoslav firm "Monteksgroeksport." It was supposed to build a hotel with "five stars" in the 247 rooms with a total area of ​​about 50 000 sq. m. Construction work stopped at the end of 1995, when the facility was ready for 90%. In 1991, the unfinished hotel was taken over by the mayor's office of St. Petersburg, and in 1992 became corporatized and owned by the bank "St. Petersburg". In 2004, he sold the unfinished "Eurofinance MOSNARBANK." The opening of the hotel under the name Le Meridien has been planned for 2008

... In St. Petersburg it is not so, as in Moscow and other cities: in St. Petersburg even the familiar term "unfinished 90" has a completely different look than the familiar and around Moscow concrete boxes

27 photos via Lana Sator





Demolish this hotel going for a long time - and in 2009, gathered in 2011, but still can not gather. So worth it moist, attracting foreign one roof unusual configuration, bright interiors, and mold on the "stucco" plasterboard.

Almost any abandoned building easier to get through the roof than to storm the locked doors and window grilles. In addition, in St. Petersburg in general everywhere is better to walk on the roof - it's faster and more comfortable, and the view is better.
02



The building is abandoned for a period sufficient to sprouting on the roof of trees generously
03



Courtyard: deserted and quiet
04



The glass arch over large hall
05



Area under the fountain
06



07



Go under the arch of the glass: in the heat like a greenhouse
08



09



On several floors down - emptiness. The glass lifts on the upper level
10



Descend below the columns of reinforced concrete with gypsum board decorated with "stucco". These reliefs in some places do not even have time to paint gold paint
11



The main hall with a gazebo
12



They say that at the time of stopping the construction here has already been installed all the plumbing, but then expensive faucets, toilets and showers tied. Only the bath
13



14



Strange, is not tied lifts
15



16



In general, the elevators in the building of more than three glass
17



18



Mould turned soft beige color in the rough "marble»
19



Regarding the lobby of the building asymmetrically even storeys
20



The lens distorts the geometry of the wildest ... but there is very air
21



One part of the building damp stronger than the other
22



Elegant gazebo. I would have thrown her out on any area of ​​the park or
23



Undetermined room with a "dome", which specifically applies sound reflected
24



There might be a restaurant
25



26



Beautiful and very spacious, but there comes a time to go ...
It is a pity that such beauty eventually be demolished. It calms only that the historical value of the building is zero.
27 (final) Thank you!
Threat to finish building the hotel Turks almost build, magnificent reception was arranged, which was invited by a priest (can not remember the name and rank) he died entering the lobby